Bond Stress Test on Rock Anchor in Clayey Siltstone
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...

Testing and Evaluation of High Capacity, Multi-Strand Rock Anchors for Lake Lynn Dam
Seventy five rock anchors with design loads of 556 to 2040 kips were required for the 1000-foot long, 125-foot high, concrete gravity, Lake Lynn Dam to comply with current FERC engineering...

Evaluation and Rehabilitation of Relief Wells
The U.S. Army Engineer District, Vicksburg has developed an expedient method of rehabilitating arrays of large numbers of gravity flowing relief wells located along the toe of dams using...

Conversion of a Concrete Slab and Buttress Dam to a Gravity Dam
The 58-foot high, 425-foot long, Ambursen-type, concrete slab and buttress, Gorge Plant Dam, which has a 120-foot long overflow spillway near the center, was converted to a concrete gravity...

Hydrologic and Structural Considerations for the Initial Filling of Jiguey Dam, Dominican Republic
This paper describes the hydrologic and structural considerations of the initial filling of Jiguey Dam which is locate on the Rio Nizao about 100 kilometers west-northwest of Santo Domingo...

The Reliability Program in Truncated JC Method
JC method is in common use in the structure reliability analysis. In this paper, the program which can be used as to consider the truncated distribution has been proposed, With this method...

Barriers for Innovation and Technology Transfer in the Public Works Infrastructure R&D
Utilization of technologies and innovation to revitalize America's public works infrastructure is beset with barriers. Some critical barriers, identified through literature review and...

The Dredging Research Program of the US Army Corps of Engineers
The Corps of Engineers Dredging Research Program (DRP) was established in Fiscal Year 1988 as a seven-year program with the objective of developing products that reduce the cost of dredging...

Management of San Diego Bay Dredged Material Disposal
This paper will discuss the Navy's efforts in the development and analysis of dredged material disposal from Navy projects within San Diego Bay. The impacts and mitigation for the alternatives...

Wave Climate Studies Along the Turkish Coast of the Black Sea
Wind-generated waves produce the most powerful forces to which coastal structures are subjected. Therefore, wave information is required for the proper planning and reliable design of...

Development of the Long Caisson Type Vertical Breakwater
The width of the caisson of a breakwater is calculated based mainly on the wave force expected to act on the caisson. IN this calculation, the assumed wave force is the peak wave force...

Dam Safety Modifications for Clear Creek Dam Manuscript for ASCE Hydraulics Division 1993 National Conference on Hydraulic Engineering
Clear Creek Dam, an unsafe thin arch dam, was stabilized by constructing a concrete gravity buttress on the downstream face. During the Bureau of Reclamation's (Reclamation) Safety Evaluation...

Determination of Hydraulic Roughness for Concrete-Lined, Supercritical Channels
A channel verification program has been initiated by the US Army Engineer District, Los Angeles to determine the hydraulic roughness of flow in a concrete channel. Specifically, this study...

A Finite-Difference Model for 3-D Flow in Bays and Estuaries
This paper describes a semi-implicit finite-difference model for the numerical solution of three-dimensional flow in bays and estuaries. The model treats the gravity wave and vertical...

Steel Exoskeleton Defines Architecture
The Hotel de las Artes multi-use complex in Barcelona, Spain consists of a luxury hotel/apartment tower, a commercial office building, retail, parking and other amenities. The most prominent...

Seismic Design of Multi-Story, Wood-Framed Buildings
The seismic design and analysis of wood-framed structures is relatively simple; however, the challenges that present themselves within this design medium are shear and overturning force...

The Optimum Gravity Dam
A method is presented for optimizing the cost of a dam by varying the properties of the material and the shape of the dam to produce the lowest cost water barrier to perform the required...

RCC for Rehabilitation of Dams in the USA-An Overview
The use of roller-compacted concrete (RCC) has rapidly become a powerful new tool in the USA for engineers involved with the rehabilitation of existing dams. Starting in 1980, RCC has...

The Construction of New Victoria Dam, Australia
The paper discusses various aspects of the construction of the New Victoria Dam, a 52 m high, high-paste content RCC dam constructed near Perth, Western Australia. The mix design and its...

Design of Miel II?A High RCC Dam
Miel II Dam is a 141 m high RCC structure designed for the tropical mountains of central Columbia. Interesting features are its height (considerably higher than any existing RCC Dam),...

 

 

 

 