Shaft Boring Machine?A Method of Mechanized Vertical Shaft Excavation
The Shaft Boring Machine (SBM) is a vertical application of proven rock boring technology. The machine applies a rotating cutter wheel with disk cutters for shaft excavation. The wheel...

Mechanical Tunnel Excavation in Welded Tuff
The Technical Review Board for the United States high-level radioactive waste facility at Yucca Mountain has recommended maximum use of 'the most modern mechanical excavation...

A First Look at Roadheader Construction and Estimating Techniques for Site Characterization at Yucca Mountain, Nevada
The Yucca Mountain site characterization program will be based on mechanical excavation techniques for the mined repository construction and development. Tunnel Boring Machines (TBM's),...

Rebuilding Buried Pipelines Without Digging
Advances and refinements in trenchless reconstruction technologies now permit system rebuilding of gravity and low pressure pipelines without excavation. Through the use of cured-in-place...

Pipeline Rehab: Underground Options
While simply digging up old pipes and replacing them is sometimes still best, other alternatives can give long life while easing the strain on the community. Trenchless methods for on-line...

Field Instrumentation Program Vital to Deep Excavation Project
An extensive field instrumentation, monitoring and evaluation program was implemented for a seven-level deep excavation project in Boston. Using the observational approach, the information...

Soil-Cement Mixed Wall Technique
This paper introduces the soil-cement mixed wall technique and its applications for the installation of cutoff walls, excavation support walls and soil-crete columns for soil stabilization....

Jet Grouting?Uses for Soil Improvement
The frequency of use of any engineering technique depends mainly on the technical feasibility and economics of the system. In geotechnical engineering, the more problems a construction...

Rocky Mountain Project Seepage Cutoff in Solutioned Limestone
The right abutment of the main closure dam for the Rocky Mountain Project required extensive treatment of deeply weathered shale and solutioned limestone to assure control of seepage and...

Potholes East Canal Headworks Project
The construction of 6.5 MW Potholes East Canal Headworks in Washington required near vertical excavation of about 100 ft (30 m) through the existing earthfill dam founded on columnar basalt....

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Soil Nails as Temporary Powerhouse Support
Newcastle Powerhouse was constructed as an underground structure with its top deck at the finished ground surface. The powerhouse is three-quarter circular and one-quarter square in plan....

Large, Monolithic, Weighing Lysimeters
Monolithic lysimeters preserve existing vegetation and soil properties that can be destroyed by excavation and filling. Site preparation for constructing large, monolithic lysimeters includes...

Specifying Trench Safety: the Texas Experience
The frequency of accidents during trenching operations has grown so dramatically that the issue has caught the attention of both industry 'insiders' and 'outsiders.'...

Temporary Traffic Deck Over Braced Excavation
A case history is used to examine the planning, design, and installation of a temporary traffic deck over a 23-foot-deep braced excavation. The deck was installed in a three-phase sequence...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...

Wrapping up Environmental Issues in an Embankment
Contamination on a construction site can lead to increased risk of unanticipated construction delays and increased costs. In response, some owners are opting for proactive approaches to...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Kinematics and Trajectory Planning for Robotic Excavation
One of the high volume and repetitive construction operations at the construction site is the excavation of soil. Automation of the excavation work requires a robotic system that is able...

 

 

 

 

Return to search