Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...

Siphon Penstock?An Economic Way to Develop Hydros
As part of the 48 MW Jim Falls Hydro Redevelopment Project by Northern States Power Company, a minimum flow powerhouse was constructed with a siphon penstock. The Minimum Flow Unit (MFU)...

Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...

Dust Control at Canyon Ferry
Since initial filling of Canyon Ferry Lake in 1955, wind blown, fine grained material from exposed flats at the upper end of the lake became a problem of increasing concern. Average deposition...

Public Involvement Strategies: A Case Study in Citizen Participation
Literally millions of dollars are wasted every year because authorized and funded water projects are stalled in court, hung up in administrative proceedings, or delayed while the project...

Planning for Small-Scale Hydroelectric Development: A State Response
A 'surplus' of power in the Pacific Northwest region of the country has brought with it a declining interest in the generation of new electrical energy supplies....

Determination of the Effects of Multiple Small-Scale Hydroelectric Projects on Resources in a California River Basin: A Matrix Approach
In 1983, Section 306 of the Energy and Water Appropriation Act required the FERC to conduct a comprehensive water resource analysis in the Upper San Joaquin River Basin, California. A...

Wilderness Hydrometeorological Study in the Colorado River Basin: A Case Study in Natural Resource Conflict Resolution
This paper describes the formation and progress of the Interagency Committee on Wilderness Hydrometeorological Data Collection (ICWHDC). It highlights how the ICWHDC is attempting to resolve...

Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...

Gas Bubble Disease in Trout Below a Low Dam
Research and efforts to reduce nitrogen supersaturation which is affecting trout in the Bighorn River, Montana, below Yellowtail Afterbay Dam is described. Nitrogen supersaturation can...

Study of River Stage Fluctuations Resulting from Possible Operations of the Susitna Hydroelectric Project
Operation of the project to follow load may result in discharge and river stage fluctuations which could affect habitats and fish food sources. Limitations on hourly, daily, and weekly...

Real Time Information Systems for Improved Port Operations
The technology to make appropriate measurements and to forecast conditions for short intervals is available today. Simple collection, analysis and dissemination systems are within the...

Galt Energy's Inverted Siphon System
Galt Energy Systems' involvement with attempting to standardize the civil component began with studies at small remote sites in Northern Ontario. The system design evolved...

Design and Construction of Paute Project, Ecuador
The Paute Project is a key element in Ecuador's program for developing a modern electric power system. When fully developed, it will consist of three separate developments:...

U.S.-China's Cooperation in Unified Resource Development
This paper reports on activities between China and the United States involving exchange of technical expertise and project development. The paper focuses on how unified resource development...

The Global Outlook for Additional Hydropower Use
The present installed capacity of hydropower, worldwide, is nearly 400,000 megawatts which provides approximately 25 percent of the electricity generated. Extensive studies of the 86-Nation...

Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...

Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...

Computer Modeling for a Power Intake
This paper describes the application of an existing computer model to respond to environmental requirements for a small scale hydroelectric power plant being developed by Allegheny Electric...

Riverbank Stability and Monitoring at Grand Coulee Dam
The capability for hydroelectric power generation at Grand Coulee Dam was substantially increased following construction of the third powerplant in the mid 1970s. Increased river fluctuations...

 

 

 

 