Use of Shotcrete on Recent Tunnel Projects in the South and East, USA
Shotcrete and rockbolts are now the primary method of ground support for the majority of rock tunnels in America. This paper describes the use of shotcrete and some of the shotcreting...

Adapted Actions Taken at Too Low Shotcrete Quality
A tunnel contract specified quality parameters such as: thickness, compressive strength, adhesive strength, bending tensile strength and residual bending tensile strength for fibre reinforced...

Soil Nailing Technique in Tunnel Support
Authors have developed a new pre-lining method (PASS method) in which thin archshell lining is formed ahead of the tunnel face before the excavation to reinforce the ground. This method...

Lattice Girders for Shotcrete Support
Lattice Girders complement the use of shotcrete for underground support by reducing the risk involved with using shotcrete alone for temporary or permanent lining of a tunnel or shaft....

Application of Shotcrete for Ground Support at Inco Mines
In 1989, shotcrete was first successfully introduced for ground support in production areas at Frood Mine. Until then the only successful application of shotcrete had been in major permanent...

Guidelines and Recommendations on Shotcrete?An International Compilation
Part of the work within the International Tunnelling Association's (ITA) working group Shotcrete Use has been to compile existing guidelines and recommendations concerning shotcrete, particularly...

Transactions of the American Society of Civil Engineers 1992
Transactions of the American Society of Civil Engineers Vol. 157, 1992 contains abstracts for all ASCE journal papers and technical notes,...

Shotcrete for Underground Support V
This proceedings consists of papers presented at the Engineering Foundation Conference held in Uppsala, Sweden on June 3-7, 1990. They are divided into sections concerned with the design...

Geometric Design Projects for Highways
An Introduction
This book provides an introduction to geometric design of highways by means of examaples and projects that emphasize basic specifications, approaches to preliminary route selection, alignment,...

IVHS: The Invisible Revolution
Federal funding for intelligent vehicle highway systems has increased a hundredfold since 1989, from $2 million to almost $200 million. Transportation planners are looking increasingly...

Recycled Roads
The movement to recycle wastes in highways appears to be gathering momentum nationwide. Rubber from old tires, wood chips, reclaimed asphalt pavement, fly ash, scrap plastic, mining wastes...

MASSPORT Modernization
Construction began last fall on the Massachusetts Port Authority (MASSPORT) upgrade of the 50-year-old Paul W. Conley Terminal in Boston. When completed in 1994, this timber-pile-supported...

Driving Under a Construction Site
Throughout the summer of 1992, vehicles passed unimpeded through one of the most heavily traveled intersections in Los Angeles County as construction proceeded on a concrete light-rail...

Supply-Side Solutions
Although the crumbling bridge infrastructure has received much attention in the press and the engineering community over the past few years, the number of structurally deficient bridges...

What Do You Mean by That?
The engineering and construction profession, like any other, has its own buzzwords and jargon. But as terms become ingrained in the profession's lexicon, they take on different...

Plastic Piling
Composite plastic and steel piles are gaining acceptance throughout the United States. The evolving technology has produced a unique product which solves several problems related to use...

Predicting Pollution
For urban areas struggling to meet the requirements of the 1990 Clean Air Act as well as state air-quality mandates, accurate forecasting of mobile emissions is critical to evaluating...

Motivating Technical Employees
The traditional methods of motivating employees�offers of higher pay and better perks�often fail to inspire technical employees, leaving their managers scratching their heads. But a review...

Preliminary Assessment of Fault Rupture Hazard at the Yucca Mountain Site Based on Expert Judgement
The judgments of seven earth science experts were elicited to quantify the uncertainties associated with the likelihood of fault displacement through the proposed repository at Yucca Mountain...

Sensitivity Analyses for Total-System Performance Assessment
As a follow-on to Sandia's 1991 preliminary total-system performance assessment of the Yuc1ca Mountain site, this paper presents results of some sensitivity analyses that were done using...

 

 

 

 

Return to search