An Interception by Boston
Engineers in Boston were recently challenged to design a rehabilitation and replacement for sections of the 60-year-old St. James Avenue sewer system. Approximately 20,000 vehicles per...

For Sure Shores
Fighting a long history of beach-destroying structures and man-made inlets, coastal engineers are finding that the answer to beach erosion lies in a deeper understanding of its dynamic...

Washington Buildup
Despite its reputation as a city mired in fiscal crisis, Washington, D. C., continues to improve its basic infrastructure. A look at three ongoing projects�a sports arena, a waste water...

Asphalt-Concrete Water Barriers for Embankment Dams
Because of its simplicity in design and construction, the asphalt concrete core is rapidly becoming the water barrier of choice for embankment dams in many parts of the world. This is...

Boston Blockbuster
The Central Artery/Tunnel project in Boston is probably the single largest publicly-funded transportation project in the country at present. The total cost will be between $8 and $10 billion...

Roads and Airfields in Cold Regions
This state-of-the-practice report on the design and development of roads and airfields is the eighth monograph in a series prepared by the Technical Council on Cold Regions Engineering...

Hawaii's Interbase Interstate
Connecting two major military installations, Hawaii's third Interstate highway (H-3) is the largest ($1 billion) HDOT project to date as well as the longest in time (planning...

The Great Texas Prison Caper
The Texas Department of Criminal Justice, under court order to relieve prison overcrowding, worked with a team of six construction management firms and a building fabrication/erection...

Columbus Clear Wells
At an average of 8 million gal. each, six new clear wells at the Hap Cremean Water Plant in Columbus, Ohio represent the largest post-tensioned, reinforced concrete noncircular tanks ever...

Ports '95
This proceedings, Ports '95, is a collection of the technical papers presented at the Ports '95 Conference held in...

Trenchless in San Diego
The Middletown Trunk Sewer is located near downtown San Diego. Sewage backups prompted a study, recommending construction of a larger replacement pipeline. The City of San Diego prepared...

Chicago Remaps Itself
Chicago, famed as the City of the Big Shoulders, is taking its own measurements in preparation for the 21st century. The city is in the midst of a $10 million, multi-year project to create...

NAFTA Handbook for Water Resources Managers and Engineers
Sponsored by ASCE; the U.S.?Mexican Policy Studies Program, Lyndon B. Johnson School of Public Affairs, The University of Texas at Austin. This report...

Artificial Recharge of Ground Water II
The Second International Symposium on Artificial Recharge of Ground Water was held in Orlando, Florida from July 17-22, 1995 and sponsored by the ASCE Special Standards Division, the ASCE...

Groundwater Management
This proceedings, Groundwater Management, contains papers presented at the International Symposium held in San Antonio Texas, August 14?16,...

Watershed Management Planning for the 21st Century
This proceedings consists of papers presented at the 1995 Watershed Management Symposium held in San Antonio, Texas, on August 14?16, 1995. These papers present research and practical...

Now Showing in San Diego
This article is a roundup of three major infrastructure projects in the San Diego area. Each of these projects will be features in the technical tours portion of the ASCE conference in...

New York Gets Wired
With users of New York City DOT's computer-aided drafting and design reaching the limits of the computer system, the department decided to turn the situation to its advantage,...

Oklahoma City Aftermath
The explosion that ripped through the Alfred P. Murrah Federal Building in Oklahoma City shortly after nine a.m. on April 19 killed 168 people, injured more than 500 and damaged more than...

ASCE Salary Survey 1995
The 23rd biennial ASCE salary survey of the civil engineering profession conducted by the ASCE Committee on Employment Conditions during the first quarter of 1995 is presented. It consists...

 

 

 

 

Return to search