Testing of Outlet Works Emergency (Guard) Gates Under Unbalanced Head Conditions ? Background and History
The U.S. Bureau of Reclamation has responsibility for ensuring the proper operation, maintenance, and safety of over 300 dams and reservoirs throughout the 17 Western States. Storage of...

Development of Test Procedures for Unbalanced Head Operation of Slide Gates
This paper will discuss the steps taken by the Bureau of Reclamation to develop a standardized procedure for testing unbalanced head operation of high-pressure slide gates for outlet works...

Getting Along: The Geotech and the CM
The opinions of geotechnical engineers are usually respected within a consulting firm, but when such a specialist gets out in the field, he or she is seen as merely part of the backup...

Pioneer Highway
The 1993 Outstanding Civil Engineering Achievement Award goes to the $490 million I-70 Glenwood Canyon in Colorado. The final link in Interstate 70 from Baltimore, Md. to Cove Fort, Utah,...

Reducing the Potential Downstream Impacts of a Dam Failure
The dam safety regulations imposed by the individual states in the United States vary widely and provide inconsistent protection for the citizens of different states. The proximity of...

The Coyote Dam Outlet Works Replacement Project: Hazard Reduction
The Santa Clara Valley Water District's Coyote Dam faced three major concerns: siltation of the existing outlet; a fault that crosses the existing outlet pipe; and the dam toe and the...

Hydraulic Performance of Culvert End Sections Designed for Collision Safety
A type of end section for pipe culverts that was designed for collision safety has some favorable hydraulic characteristics. These safety end sections are long and narrow with large steel...

Dam Safety Modifications for Clear Creek Dam Manuscript for ASCE Hydraulics Division 1993 National Conference on Hydraulic Engineering
Clear Creek Dam, an unsafe thin arch dam, was stabilized by constructing a concrete gravity buttress on the downstream face. During the Bureau of Reclamation's (Reclamation) Safety Evaluation...

Bartlett Dam Fuseplug Auxiliary Spillway
Bartlett Dam is located approximately 77 km northeast of Phoenix, Arizona on the Verde River. The Bureau of Reclamation (Reclamation) has determined that the structure is not capable of...

The Dam Safety Process
A safe dam is one which performs its intended functions without imposing unacceptable risks to public safety, property, and welfare by its presence. Ensuring the safety of a dam requires...

Bureau of Reclamation Downstream Hazard Classification
An overview of the downstream hazard classification process used by the Bureau of Reclamation (Reclamation) and other U.S. Department of the Interior (DOI) agencies for the safety of dams...

Using Threat to Life Studies to Guide Dam Safety Decisions
Ensuring that Bureau of Reclamation (Reclamation) dams do not present unacceptable risks to public safety, prosperity, and welfare serves as a primary objective of Reclamation's Safety...

Economic Aspects of the Bureau of Reclamation Safety of Dams Program
The paper briefly examines economic aspects of the Bureau of Reclamation (Reclamation) Safety of Dams (SOD) program evaluation process. Procedures described include the downstream damage...

Emergency Action Plan
Although most dam owners have a high level of confidence in the structures they own and are certain their dams will not fail, the Bureau of Reclamation (Reclamation) included, history...

Scour Prediction Model at Bridge Abutments
A model to predict local abutment scour is presented. The model is based on a large number of laboratory experiments over the past half century. The dependent variable, a ratio that includes...

Assessment and Prediction of Debris-flow Hazards
Study of debris-flow geomorphology and initiation mechanism has led to better understanding of debris-flow processes. This paper reviews how this understanding is used in current techniques...

Research Needs for Debris Flow Disaster Prevention
A 'soft' disaster reduction strategy is proposed based on identification of hazard location, extent and maximum intensity; monitoring of antecedent catchment moisture, sediment and vegetation...

Debris Flows and Mass Wasting in Volcanic Torrents
Observation of debris flow and topographic survey for mass wasting in the volcanic torrents clarified that (1) mass wasting processes such as rock fall from the side-wall and toppling...

Interpreting Debris-Flow Hazard from Study of Fan Morphology
The deposits, stratigraphy, and surface morphology of debris-flow fans are a record of past debris-flow activity, and as such can provide useful information about debris-flow hazards....

Riprap Design at Bridges?Factor of Safety Approach
The factor of safety method offers a physically based methodology for design of riprap that relates the applied shear stress on the channel boundary to the stability of the riprap layer....

 

 

 

 

Return to search