Maximizing Your Use of Interactive Graphics in Transportation Simulation Modeling
The paper discusses the capabilities, through the aid of computer graphics,now that exist to take analysis and reporting of traffic simulation model studies several steps further than...

Dynamic Assignment Modelling with Trips
This paper describes additional ways in which TRIPS models time-varying, or 'dynamic' effects. These include area-wide effects as vehicles move through the network,...

Using GIS Techniques for Transportation Planning to Automate Compilation of Land Use Information
This paper describes a procedure used to compile land use or socioeconomic data for traffic analysis zones for input into a transportation planning model. The procedure uses a combination...

Florida Bridges Beat the Clock
Today, when budget overruns and delays on construction projects are the rule more than the exception, 11 precast segmental balanced cantilever bridges on two contracts were recently completed...

Overhauling and Opening to Traffic of a Toll Tunnel in Marseilles (France)
The city of Marseilles called for bids for overhauling and opening to traffic an old unused railway tunnel, under the very center of the city. The tender scheme was a concession. The paper...

An Example of Privately Funded Project
The paper discusses the proposal of the Syndicat des Transports Parisiens, the local authority in charge of Public Transports in the Paris region, to ask private firms to implement without...

Deadly Debris Flows on I-5 Near Grapevine, CA
A series of debris flows inundated the southbound lanes of interstate Highway 5 (1-5) approximately 110 km (70 mi) NW of Los Angeles, California, between Fort Tejon and Grapevine, early...

Phoenix Flood Hydrology for Price Expressway
Recently HDR Engineering, Inc. (HDR) completed a study of the off-site stormwater volumes and peak flow rates for the Price Expressway and Santan Freeway in suburban Phoenix. HDR is the...

Flow Field Near an Inland Navigation Tow
As a vessel moves through a body of water, disturbances are created in the form of altered water levels such as waves or drawdown and altered flow fields such as increased velocities and...

Data Acquisition for Determining the Physical Impacts of Navigation
Research is being conducted to determine the physical effects of navigation on the Upper Mississippi River System (UMRS). Extensive field data on various aspects of physical effects of...

Prototype Measurements of Flows Induced by Navigation Tows
Present projections of growth of commerical navigation traffic indicate that annual tonnage per tow and/or number of tows will continue to increase through the foreseeable future. In order...

The Development of a Plan of Study to Evaluate the Physical and Biological Effects of Increased Navigation Traffic on the Mississippi River
An integrity team prepared a Plan of study (POS) that represents the first comprehensive effort on the Upper Mississippi River (UMR), to identify and quantify impacts associated with commercial...

Microcomputer Applications in Transportation III
This proceedings consists of papers presented at the International Conference on Microcomputers in Transportation which was held on June 21-23, 1989 in San Francisco, California. They...

The Stacked Drift Tunnel
The Mount Baker Ridge Tunnel is the first of its kind and the last: a forward thrust of technology and a look back to the flow of federal highway funds, which paid 90% of its cost. The...

Let the Buyer Beware
As recently as the 1970s, state highway agencies blindly purchased land for projects without much concern for hazardous waste. But that changed in 1980 with Superfund legislation, specifically...

Untangling A Can of Worms
Increasing traffic volumes combined with rush-hour delays and commuter complaints have spurred New York State DOT to improve the capacity of a major interchange near Rochester. The interchange,...

Facelift For an Interchange
The authors describe a $250 million reconstruction project on a three-level interchange linking I-84 and I-91 in Hartford, Conn., which is the largest rehabilitation project in the state's...

Bumpy Road Ahead
By 1999, we will be riding on highways and public transit paid for by the 1991 reauthorization of the National Surface Transportation Act. Or maybe we won't. The new bill,...

Commuter Control
Traffic management systems are a relatively new way to expand the capacity of existing highways and to utilize new ones realistically. Several major systems have been in place and new...

Reconstruction Under Traffic: A Study of Some Effects of the Dan Ryan Project on Motor Carrier Operations in Northeast Illinois
The paper discusses preparations by the Chicago Area Transportation Study for a study of the operational responses of truckers to whatever effects upon the regional highway system are...

 

 

 

 

Return to search