Blasting Densifies Sand
Constructing the Jebba Dam on Nigeria's Niger River required in-place densification of large volumes of loose sand to record depths of up to 131 ft. Vibrocompaction was used...

Lifeline Seismic Risk Analysis?Case Studies
These papers employ design concepts and procedures in lifeline seismic risk analysis. Two of the papers describe the seismic hazards in the northwestern United States. A systems model...

Field Permeability Test for Earthen Liners
A sealed double-ring infiltrometer (SDRI) was developed for in-situ measurements of the hydraulic conductivity of earthen liners and covers. The characteristic of the SDRI that distinguishes...

Landslide Investigations Using the Weight Penetrometer
The weight penetrometer is a light weight device and can be easily deployed on slopes not accessible to conventional exploratory tools such as drill rigs or cone penetrometers. The weight...

Strength of Fine-Grained Soils Using the Piezocone
Evaluation has been made of several theories and methods for deducing the undrained and effective stress strength of saturated fine-grained soil from piezocone test results. Bearing capacity...

Laboratory and Field Evaluation of Cone Penetrometers
Cone penetrometers from 8 organizations have been studied by performing laboratory tests and field tests. The testing show that pore pressure and temperature zero shift affect significantly...

Effctive Stress Interpretation of In-situ Tests
Significant differences in terms of load-settlement curves obtained from Plate Load Tests (PLT) and q//c profiles obtained from Static Cone Penetration Tests (SCPT) at two sites with different...

Rapid Assessment of Seismic Vulnerability
The choice of a seismic damage assessment method depends fundamentally on how the assessment will be used, but always involves definition of the expected ground motion and the structure...

ATC Methodology and Data for Rapid Assessment of Seismic Vulnerability
Recently developed Applied Technology Council (ATC) methodology and data provide a technical basis for rapid assessment of structure seismic vulnerability. Methodology developed under...

Evaluation of the Seismic Performance of Buildings
The aim of the paper is to present the different existing methodologies available for the assessment of seismic damage to buildings. The approach aims towards the development of a mini-computer...

Techniques for Estimating Earthquake Probable Loss for Buildings and Contents
The probable maximum loss (PML) is useful for quantifing the seismic risk exposure of a facility and for rational decision making regarding earthquake insurance and seismic strengthening...

Rapid Identification of High Risk Building in Seismic Regions Using Expert Systems
Seismic risk evaluation is a complex problem because it involves many factors such as ground motion, ground failure potential and structural performance with great uncertainties. Many...

Seismic Risk Analysis of a Multi-Site Portfolio of Buildings
A discussion of a methodology that permits the assessment of the seismic risk associated with a group of buildings and incorporates relevant aspects of seismic hazard assessment including...

Seismic Response of Pipes Supported on Complex Frames
Analytical approaches and modeling techniques used to calculate seismic responses of piping systems, supported on complex open-frame structures, are evaluated. Seismic responses are obtained...

Effects of High Pressure and Temperature on HCP
A modification of fabrication techniques for cement paste can significantly affect its properties. Specifically, the static compressive strength can be increased over that of specimens...

Influence of Surface Conditions on Surface Temperature
Geotechnical engineers working in areas of discontinuous permafrost are frequently faced with the necessity of designing facilities with a minimum of thermal disturbance. Construction...

Lifeline Risk Analyses: The Mokelumne Aqueduct Study
Probabilistic risk analysis methods are applied to the evaluation of seismic and non-seismic vulnerability of a 25-kilometer length of a major lifeline aqueduct system. In addition to...

Computerized Construction Progress Control
In 1983 and 1984, an exploratory tunnel was constructed as part of the geotechnical exploration program for two highway tunnels to be constructed for interstate 70 through Glenwood Canyon,...

A Power Planning Model for Seismic Risk Zones
We present a model to configure a nuclear power system consisting of plants and the distribution network. In the model, we quantify seismic risk as comprehensively as possible in terms...

Techniques for Rapid Assessment of Seismic Vulnerability
Under the impetus of a growing awareness of seismic hazards, there is an increasing effort being devoted to assessing the seismic vulnerability of existing buildings. For many professionals...

 

 

 

 

Return to search