Seismic Solutions for Steel Frame Buildings
After the Northridge Earthquake, damage in steel moment resisting frame connections stunned engineers. Now those engineers are scrambling to find and test new kinds of connections. This...

Spotlight on Steel Moment Frames
Engineers' confidence in moment connections was shattered when damage was discovered after the 1994 Northridge earthquake. Such connections are now a hot subject for U.S....

Financing the Future of Storm Water
For Sarasota County, Fla., draining storm water no longer means draining municipal funds. By establishing a modern storm-water utility, the county has provided a dedicated funding source...

Boston's Third Harbor Tunnel (Available only in Focus on Geo/Environmental Special Issue)
Boston's immersed marine tube, the Third Harbor Tunnel, connecting South Boston and Logan Airport, is a $226 million component of the multi-billion dollar Central Artery/Third...

Photogrammetric Mapping
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 14. This manual provides procedures, minimum accuracy...

Returning Veteran
The Veteran's Memorial Bridge on the Cuyahoga River is a vital link in the transportation system of Cleveland and a gateway to the city's downtown area. But time...

Asphalt Update
Of the $150 million spent in the five-year Strategic Highway Research Program (SHRP), $50 million went to research to improve the durability and cost-effectiveness of asphalt pavements--on...

Start the Presses!
Turning an existing bleach manufacturing facility into a printing plant required careful structural design to support a wide range of production processes. The new Daily News facility...

Hydraulics of Subsurface Flow Constructed Wetlands
Resistance to flow through subsurface flow wetlands is described by Darcy's law or by Ergun's equation. Both representations are combined with the continuity...

Application of a Hydrodynamic Model in Design of the Kingman Lake Wetland Restoration Project
The U.S Army Corps of Engineers Baltimore District is restoring 45 acres of wetlands within Kingman Lake in the District of Columbia through the placement of dredged material from the...

Siting Low Profile Grade Control Structures for the Muddy Creek Demonstration Stream Restoration Research Project
In the Fall of 1993 Reclamation began a demonstration stream restoration research project on Muddy Creek, near Great Falls, Montana. Muddy Creek captures return irrigation flow from a...

Features of a Chevron Weir Rock Ramp
This paper presents the features of a new type of low profile grade control structure, the chevron weir rock ramp. As the name infers, the planform of the structure is in the shape of...

Hydraulic and Engineering Considerations in Designing Constructed Treatment Wetlands for a Lake Restoration
A 12,600 ha (31,000 acre) hypereutrophic lake in central Florida is being restored by constructing a 2,020 ha (5,000 acre) wetland filter to remove suspended sediments and particulate...

Water Control Structure Choice for Wetland Restoration/Creation
Ducks Unlimited is a non-profit conservation organization, whose mission is to fulfil the annual life cycle needs of North American waterfowl by protecting, enhancing, restoring, and managing,...

Effect of Grade Control Structures on DEC Streams
Controlling the grade of a channel with structures has been an effective means applied to streams. Although, the effectiveness of grade control structures is not readily apparent until...

Siting of Grade Control Structures
In siting a grade control structure in a stream, hydraulic considerations must be integrated with other important siting factors. A review of several of the important siting factors is...

White River Fish Screen Project?Hydraulic Modeling
In 1983, Puget Sound Power and Light Company (Puget Power) proposed in a license application to FERC for the overall White River Project replacement of the existing fish screens constructed...

Engineering Features of the Red Bluff Research Pumping Plant
In 1995, the construction of the Red Bluff Research Pumping Plant (RBRPP) was completed. The pumping plant is a research facility for evaluating the biological/engineering features of...

Dam Foundation Erosion Study: The Design of a Sidewall Orifice for Simulation of a Free Trajectory Overtopping Jet
This paper describes the design of a sidewall discharging orifice for simulation of a free trajectory overtopping jet. A sidewall orifice discharges through the sidewall of a pipe. The...

Genetic Algorithm Design of Piped Irrigation Systems
The design of piped irrigation systems is a complex matter. In its simplest form it involves the selection of the sizes of pipes and other hydraulic elements so as to ensure that the varying...

 

 

 

 

Return to search