Sedimentation and Self Weight Consolidation of Dredge Spoil
Test results suggest that self weight consolidation begins when an interface forms in the settlement column and the slurry reaches a critical concentration as a result of the solid particles...

Dredged Slurry Stabilization for Seagirt Marine Terminal
The Seagirt Marine Terminal is constructed on reclaimed land on dredged spoil from the I-95 Fort McHenry Tunnel in Baltimore, Maryland. Three stabilization procedures considered applicable...

A Nebraska Power District's Experience in Stabilizing by Silt Injection
The structures, rolled earth and concrete, of the Central Nebraska Project are constructed on foundations of loessial soils that range from a few feet to more than 100 feet in depth. The...

Analysis and Design of Pile Foundations
Piles are one of the oldest type of foundation system known to man and as such have been previously studied in depth based on available modeling and monitoring techniques. An increased...

Practical Guidelines for the Selection, Design and Installation of Piles
This report provides an objective practical basis for the design and construction of pile foundations. Potential problems and uncertainties in pile design and construction are emphasized....

Building on Air
Copley Place, a $500 million hotel/retail/office/residential complex, was built on air rights over the Massachusetts Turnpike and an adjacent railroad in Boston. Two hotels occupy land...

Geotechnically Allowable Stress for Driven Piles
There are opposing opinions on what value to use for allowable stress in driven steel piles. The key is that two types of stress must be considered: the structurally allowable stress,...

Coastal Structures '83
The objective of the conference Coastal Structures '83 was to develop in-depth discussion of the state-of-the-art and future needs concerning coastal structures. Design, construction,...

Lightweight Fill Helps Albany Port Expand
Lightweight aggregate was used as a soil fill in the reclamation of a marine terminal at the Port of Albany, New York in order to stabilize the dockside area. Gravel-filled steel sheet...

Geotechnical Practice in Offshore Engineering
The offshore industry as it exists today is just 30 years old. In that period the depth of water where structures are built has increased from a few feet to over 1000 feet. The performance...

Mall
In order to get its citizens back on its downtown streets after 6 PM, Milwaukee decided to build a mall, combining new buildings along with renovations of existing buildings. The problem...

Pile Construction Practices in Arctic Regions: State-of-the-Art
Pile installation techniques in cold regions include drill and slurry, and driven methods for foundation designs. In the past, piles used for structural support in permafrost have consisted...

Thaw Settlement Analysis for Buried Pipelines in Permafrost
This paper focuses on determination of allowable thaw settlement for the design of cross country pipelines in permafrost areas. The purpose of the thaw settlement evaluation is to aid...

Oil Rigs Designed to Combat Arctic Ice
Exploration and drilling rigs now being designed for use in the Beaufort Sea must withstand ice forces never before encountered. Design approaches include using the geometry of these structures...

A Cost-effective Shallow Foundation Accommodates Three Feet of Settlement
An automotive maintenance facility to be built at the Anacostia Naval Station in Washington, D.C. had two major foundation problems: the probability of large settlement and the possibility...

World's Largest Installation of Fabric-Formed Pile Jackets
One major feature of fabric forming is permeability. One application of this technique is protective encasement of steel H and pipe piles at a major pier in Chile. The Huachipato Pier...

Shanghai Tunnel Projects Spur Construction Innovations
Since underground construction in soft ground is newly developed in Shanghai, there is little experience there as compared to what is known for specific sites in other countires. Well...

Oregon Bridge Features Innovative Bell Piers, Floating Falsework
The I-205 bridge, scheduled for completion in 1983, will be a final link in a 40-mile highway east of Portland, Oregon. the substructure and superstructure design featured unusual technology....

Rehab or Replace? Foundation Testing Provides the Answer
A $15 million, multidisciplinary testing program was undertaken to determine the least expensive methods of rehabilitating Locks and Dam No. 26 on the Mississippi River. The Problems were...

Wicks, Fabrics and Sawdust Overcome Thick Mud
A new Dumbarton bridge is replacing the original which was built in 1927 to cross San Francisco Bay at its southern end. The bridge approaches are constructed on top of salt ponds, with...

 

 

 

 