Retrofitting for a New Life in Power
Despite continued growth in energy demands, electric utilities in the U.S. aren't building many new powerplants these days, due to the economic and regulatory roadblocks they...

Sylmar HVDC Converter Station East Seismic Design
The Sylmar Converter Station East in Los Angeles receives power from the Northwest via the Pacific HVDC Intertie, a ?500 kV dc transmission line. At Sylmar, the energy is converted to...

Long Distance Dam Data
Remote data collection systems are increasingly being used for dams. Instrumentation of structures for obtaining data on performance is not new. However, automation and computerization...

Seismic Design and Construction of Complex Civil Engineering Systems
This publication presents information about practices for planning, designing, and constructing civil engineering systems for mitigating earthquake effects. Concepts dealing with defining...

Pipe Jacking Advances
Pipe jacking is the remote placement of pipes underground by means of a tunneling machine that carries a train of pipe behind it. This is a relatively new technology in the United States,...

Innovation?The Key to Local Roads Survival
The pressure of trying to get the job done within a limited budget have forced innovations in field operations to support local roads systems. This paper lists a few examples of innovations...

Critical Issues in Highway Engineering Education
The four critical issues addressed are: Recruitment/retention of faculty; Deteriorating laboratory equipment; Undergraduate student enrollment-quantity and quality and Graduate student...

Innovative New Developments in Concrete Slipform Paving Equipment for the 21st Century
The Surface Transportation Assistance Act of 1982 gave new life back to the concrete paving industry by bringing a welcomed and necessary increase in the volume of concrete paving work....

Portland Cement Concrete Pavement in the 21st Century
The future of Portland Cement Concrete Paving in the 21st Century holds vast challenges that we as industry must be ready to tackle head on. Looking ahead, we see an even more vital role...

Asphalt Pavements of the Future
There will be major changes in the Hot Mix Asphalt Industry throughout the next decade and into the 21st century. Acquisitions, diversification, SHRP, the emergence of new technologies...

Western Consortium on Advanced Highway Technology
Establishment of a regional consortium of western states for purposes of defining long-term objectives and making common cause in the development of advanced highway technology was undertaken...

Computers Board Equipment
Construction equipment is slowly being automated, either with remotely operated radio controls or by on-board computers that control repetitive tasks. Contractors in the United States...

Probabilistic Site Strategy for Transmission Lines
A probability-based geotechnical site characterization strategy is presented for transmission line structures. Because site-specific data are sparse for these structures, a Bayesian model...

Construction and Design of Foundations for French Overhead Power Transmission Network
This paper summarizes present conception and design of foundations for 90 to 400 kV overhead lines in France. Firstly principles of geotechnical studies in use are presented: various types...

Uplift Capacity of Model Group Anchors in Sand
Small-scale laboratory experimental results for the ultimate uplift capacity of shallow horizontal circular single and group anchors embedded in sand have been presented. The experimental...

U.S. Coast Guard Experience with Wave Turbines
Since 1980 the United States Coast Guard has been developing a lighted buoy for exposed areas and congested harbor entrances. The buoy hardware is of conventional design while the signal...

Cogenerating Columbia River Salmon and Hydropower
In recent years a number of regional institutional arrangements have been consumated which have potential for reducing overfishing of Columbia River chinook stocks. In the Pacific Northwest...

Use of Vibration Measurements in Structural Evaluation
Over the past decade the capabilities for vibration measurements and analysis have advanced significantly. It is now a routine procedure to be able to measure natural frequencies of structures...

Computer Scheduling: On-Line and On-Time
The Intermountain Power Plant, a coal fired, 761 MW coal fired electrica generating facility, has been completed months ahead of schedule and substantially under budget. Project managers...

 

 

 

 

Return to search