The Design, Analysis and Manufacturing of Pickwick Landing Replacement Runners
This paper presents new computer automated techniques for the design, analysis and manufacture of Kaplan turbine blades. The inlet flow field was determined using the finite element program...

Design and Manufacture of Turbine Runner Blades Using CAD/CAM-Technology
Interactive blade design, fluid flow analysis, stress analysis and NC-matching of both model and prototype blades are working from a common data base and are demonstrated in this paper....

Advance Prediction of Flow-Induced Variations
Frequency analysis of hydraulic vibrations has been applied using a transfer matrix and impedance method. The computer program is given for the self-excited and forced vibrations, together...

Hoover Dam Plus Fifty Years Equals El Cajon Dam
The completion of El Cajon arch dam on the fiftieth anniversary of the completion of Hoover Dam has given the opportunity to compare design and construction of two concrete arch dams constructed...

Evaluation of Liquefaction Potential of Anderson Ranch Dam
This paper contains a description of a liquefaction evaluation of the alluvial foundation soils at Anderson Ranch Dam, which was performed as part of the USBR's program of...

Arch Dams for Small Hydroelectric Sites
Approximate formulas are developed for the design of small arch dams. These designs, although conservative, frequently allow for economies over other dam types. Considered are: an approximate...

Changing Stability Criteria: Effect on Older Dams
Many of the dams on the Georgia Power Company system were designed and constructed in the early 1900's. Changes that have occurred in stability criteria since construction...

Dynamic Analysis of Existing Tarbela Intake Towers
According to general practice at the time of the design, the pseudostatic method of applying earthquake loading was used. The basic acceleration was 0. 1g. A post-construction seismological...

Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...

An Overview of Hoover Dam Tunnel Spillway Damage
The Hoover Dam tunnel spillways have provided the Bureau of Reclamation hydraulic laboratories with new and continued opportunities for applied research. During the peak years of the Boulder...

Dam Safety Relating to Merwin and Yale Hydroelectric Projects
This paper describes the safety investigations performed to evaluate the dams, associated with the Merwin and Yale Hydroelectric Projects, for the effects of severe floods and earthquakes....

Safety of Dams Activities in the Bureau of Reclamation Lower Colorado Region
In the Lower Colorado Region of the Bureau of Reclamation (BuRec), there are presently eight BuRec dams and one Bureau of Indian Affairs dam being modified or studied for modification...

Application of Computer Aided Design and Analysis Tools for Upgrading Existing Power Plant Equipment
This paper presents examples where state-of-the-art computer aided design and analysis techniques have been applied to upgrade hydraulic performance and structural reliability of existing...

Synopsis: Ozark-Webbers Falls Turbine Repairs
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U. S. Army Corps of Engineers and are located on the McClellan-Kerr Arkansas River Navigation...

Application of an Integrated Numerical System for the Modernization of Hydro Turbines
The modules of an integrated numerical system for the new design and replacement of hydro power plant components are described and some examples of application are shown. The main modules...

Preventing Fish Mortality at a Large Pumped Storage Plant
A field study program was initiated at the Truman Project to obtain a better understanding of which fish species in the tailrace area would be most susceptible to turbine passage, determine...

Real Time Information Systems for Improved Port Operations
The technology to make appropriate measurements and to forecast conditions for short intervals is available today. Simple collection, analysis and dissemination systems are within the...

Interactive Simulation of Hydropower Systems
This paper describes a new educational technology that has proven extremely effective in introducing both technical and lay persons to the operational principles, management alternatives,...

Hydro System Enhancement: TVA's Comprehensive Hydropower Program
The Tennessee Valley Authority's Comprehensive Hydropower Program is systematically identifying opportunities for increasing hydroelectric generation in five areas: small...

Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....

 

 

 

 