Upper Stillwater Dam Construction Program
Utilizing both proven and innovative construction techniques, equipment, and design concepts, Tyger Construction Company Inc. , located in Spartanburg, South Carolina, has undertaken the...

Economic Considerations in Selection of a Roller Compacted Concrete Dam
Roller compacted concrete (RCC) has recently emerged as an economically attractive material for gravity dam construction, replacing the use of conventional concrete and even challenging...

USBR Design Considerations for Roller Compacted Concrete Dams
Current Bureau design criteria for concrete dams are based on analytical methods developed and improved over the years, evaluation of construction methods and post construction materials...

Transportation '85
Abstracts
Abstract only. The abstracts are presented of the papers presented at the 16 Sessions of the Conference, Transportation 85. The papers relate to the following session topics: CAD (ADS,...

Trends in Small Computer Utilization
In an effort to determine the extent to which micro and minicomputers have been successfully implemented by construction contractors, the authors compiled a comprehensive questionnaire...

Characteristics of Indiana Soil Properties
The Indiana Geotechnical Data Bank was established to collect engineering soil data in the state and to provide information for engineering planning and design works. It contains nearly...

Small Computers in Construction
These proceedings are the result of a symposium sponsored by the Task Committee on the Application of Small Computers in Construction of the Construction Division of ASCE. Nine papers...

Tunnelling in Soil and Rock
The relationship between tunnel design and construction is covered with emphasis on case histories of field measurements and performance. A general report emphasizes the importance of...

Probabilistic Characterization of Soil Properties
Bridge Between Theory and Practice
The two objectives established for these proceedings are: (1) to summarize the principles and procedures of probabilistic characterization of soil properties in a readily understood manner...

Fast Tracking Milwaukee's Stormwater Cleanup
In building a massive sewer and treatment plant, Milwaukee solved legal and management problems. At the same time, the city speeded design and construction for the project. Triggered by...

Engineering Liabilities for Design of a Bridge That Failed During the San Fernando Earthquake
On February 9, 1971, the San Fernando Valley in Southern California experienced a major earthquake. Among the victims were two men who were killed when a bridge connector ramp of a newly...

Seismic Considerations for the Century Freeway
The Century freeway (Interstate 105), will be an 18 mile (29 km) long, six-lane facility with 2 central transit/HOV lanes, located in Los Angeles, California. The freeway alignment crosses...

Seismic Design for Sacramento Light Rail Transit System
The Sacramento Light Rail Transit Project is an 18. 5 mile system which provides the trunk line service for an integrated Bus/LRT public transportation system. Seismic design utilized...

Seismic Design of Underground Structures Southern California Metro Rail Project
The effect of earthquakes on underground structures is the imposition of an arbitrary deformation which cannot be changed by strengthening the structure. The structural design goal is...

CSMIP Strong-Motion Instrumentation and Records from Transportation Structures?Bridges
Seven transportation structures have been instrumented by the California Strong Motion Instrumentation Program (CSMIP), including four bridges. Records (in excess of 0. 25 g maximum acceleration)...

Seismic Design of Airport Control Towers
The paper describes state-of-the-art design in seismically active areas. It includes a review of current code design parameters and specific tower design criteria. Tower design examples...

Port of Seattle Seismic Waterfront Design
This paper describes the soil seismic design process, using the design developed for a concrete apron project at Terminal 20 as an illustration. Damage by the 1965 earthquake is described....

Performance of Water and Sewer Lifelines in the May 2, 1983 Coalinga, California Earthquake
Water supply and filtration systems for the City of Coalinga suffered little damage. The water transmission system suffered five breaks. The urban distribution system was disrupted, but...

Intermountain Power Project Seismic Design
Coal-fueled generation units of the Intermountain Power Project are constructed in a seismically active area of Utah (UBC Zone 3). The seismic design criteria were published during the...

A Summary of the Seismic Qualification Utilities Group (SQUG) Program
In 1980, the Nuclear Regulatory Commission (NRC) designated Unresolved Safety Issue (USI) A-46 to address the seismic safety of equipment in operating nuclear power plants. In 1982, the...

 

 

 

 