Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...
Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...
Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...
Licensing the Moose River Hydroelectric Project
This paper describes environmental considerations in the licensing and permitting of the Moose River Hydroelectric Project, a 12.2 MW development in Central New York State. It illustrates...
Geology Related Construction Problems at the Urugua-i Hydroelectric Project
The Urugua-i Hydroelectric Project in north-eastern Argentina consists of an 80 m high roller-compacted concrete dam, 4.4 km long lateral dike, 800 m long power tunnel, and a 120 MW powerhouse....
Geology and Hydrofacture, Moose River Power Tunnel, New York
The Moose River Hydroelectric Project, Lyonsdale, New York, is constructed in Precambrian gneiss of the western Adirondack Mountains. A key element of the project was construction and...
In-Situ Shear Strength Testing
Dam stabilization requirements at the Upper Mechanicville Hydroelectric Project on the Hudson River in New York were significantly modified based on the results of an in-situ direct shear...
The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...
Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...
Crest Gates Design for Upper Mechanicville
This paper describes the design of flap-type spillway crest gates for the Upper Mechanicville Project, located on the Hudson River near Mechanicville, New York. These gates are being provided...
Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...
Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...
Yacyreta Hydroelectric Project Turbine Design
This paper provides general information about this major hydroelectric project on the Parana River on the border between Argentina and Paraguay in South America. In addition, some specific...
Field Efficiency Tests of a Large Pump-Turbine
The New York Power Authority's Blenheim-Gilboa Pumped Storage Project began commercial operation in 1973. In 1987, the Authority initiated a study of the existing pump/turbines...
Acoustic Flowmeter/Efficiency System Installation at the Niagara Power Project
The New York Power Authority's Robert Moses Niagara Power Project (RMNPP) recently installed an acoustic flowmeter/efficiency system on two 150 MW rated generators. This paper...
Crescent and Vischer Ferry Hydroelectric Redevelopment Projects
The owners of aging small hydro plants face a myriad of complex technical, economic, and regulatory challenges as they seek to reliance and prepare their projects for continued operation...
Pumping System Permits Diversion of Water River Dam
For project construction at an existing Corps of Engineers' dam in New Mexico, where modifications to the existing outlet works were performed, a barge-mounted pumping system...
Fluctuating Pressure Measurements on a Large Hydro Turbine
The New York Power Authority is investigating the feasibility of upgrading the thirteen 150,000 kW turbines-generators at the Robert Moses Niagara Power Station to improve efficiency and...
Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....
Coastlines of Brazil
These papers were presented at Coastal Zone '89 the Sixth Symposium on Coastal and Ocean management held in Charleston, South Carolina, July 11-14, 1989. This volume is a...