Implementation of NUREG 1318 Guidance Within the Yucca Mountain Project
The U. S. Department of Energy's Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the U. S. Nuclear Regulatory Commission...

Defining the Need for and Functions of the Monitored Retrievable Storage (MRS) Facility
A series of system studies of the Civilian Radioactive Waste Management System were conducted by the Department of Energy (DOE) to determine the role for a Monitored Retrievable Waste...

Facility Interface Capability Assessment (FICA) Project
The U.S. Department of Energy-Office of Civilian Radioactive Waste Management (DOE-OCRWM) is sponsoring the Facility Interface Capability Assessment Project to determine current and potential...

DOE-EM/Producers Strategy for Wasteform and Process Startup Acceptance
The high-level waste (HLW) sites are working closely with the Department of Energy's Office of Environmental Restoration and Waste Management (DOE-EM) to ensure that the activities...

An Overview of the Vitrification of Defense High-Level Waste at the Hanford Site
Nearly 63 percent of the nation's high-level nuclear waste has accumulated at the U.S. Department of Energy's (DOE) Hanford Site in Washington State. This accumulation...

Two Citizen Task Forces and the Challenge of the Evolving Nuclear Waste Siting Process
Siting any nuclear waste facility is problematic in today's climate of distrust toward nuclear agencies and fear of nuclear waste. This study compares and contrasts the siting...

The Development of Small Area Socioeconomic Data to be Utilized for Impact Analysis: Rural Southern Nevada
This paper describes the process by which economic and demographic estimates and projections will be prepared to determine the potential economic and demographic impacts that may result...

Properties of the West Valley Waste Form
The centroid composition of the West Valley Demonstration Project waste form has been selected on the basis of criteria mandating high chemical durability and good processibility. A review...

Soluble High-Level Waste Decontamination and Disposal at the Savannah River Site
The high-level radioactive waste that has accumulated at the Savannah River Site is stored in large underground steel tanks. Programs to remove the soluble waste from the storage tanks,...

The Technical Review Group: An Application of the Quality Assurance Program Descriptions for Defense High-Level Waste Processing
This paper describes the formation of a technical review group (TRG) as an early application of the quality assurance program for high-level waste processing. The objectives and functions...

The DWPF Product, and Its Qualification Program
The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) will be the first facility in the nation capable of immobilizing high-level nuclear waste. Production of DWPF...

Opportunities for the Nuclear Waste Negotiator
The Nuclear Waste Negotiator (the Negotiator) has the potential to have a significant positive impact on the United States High-level Radioactive Waste Management program perhaps more...

Linkage Between Site Characterization Program and Performance and Design Data Needs
The basis for identifying site-specific data needs for the Yucca Mountain site was a thorough review and evaluation of the regulatory requirements for a geologic repository. The U.S. Nuclear...

Preliminary Conceptual Design Description of the Proposed DOE Store-Only Monitored Retrievable Storage (MRS) Facility
The Nuclear Waste Policy Act (NWPA) of 1982 required DOE to examine the options for the provision of long term spent fuel storage in monitored retrievable storage (MRS) facilities. Specifically,...

Requirements and Concept for an On-Orbit Construction Facility for Phase 1 Space Station Freedom
Future NASA plans for exploring the solar system and programs such as the Large Deployable Reflector and Pathfinder require in-space construction for their success. The technologies required...

Site Constraints for a Lunar Base
A rigorous site plan is a prerequisite for quantitative analyses of lunar base operations. The development of such a site plan, done for a detailed lunar base study (RLSO, 89), is described...

Lunar Base Elements Designed for Robotic Operations
Equipment concepts developed for a study of robotic lunar surface operations are presented. The concepts were evolved together with a consistent robotic buildup and operations scenario;...

Manifesting for a Lunar Robotic, Oxygen-Producing Base
Using robotic systems and human supervisory control, a lunar base reasonably be established to achieve full production within five years. Intermittent human presence works in coordination...

Conceptual Design for a Lunar-Base CELSS
Future human exploration is key to the United States National Space Policy goal of maintaining a world leadership position in space. In the past, spacecraft life support systems have used...

Synthesis of a Space Infrastructure
The Rockwell International 'Integrated Space Plan' consolidates a broad range of near-term and long-range objectives for the development of space. Beginning with...

 

 

 

 

Return to search