Automation of Union Electric's Hydro-Power Plants
Union Electric Company is spending twelve million dollars on Electronic Control and Monitoring equipment at two of their hydro-electric plants (a total of twenty-seven generating units)...

Overview of Acid Mine Drainage Control Strategies
Since 1970, regulations requiring proper overburden sampling techniques to obtain representative geologic profiles and outline specific overburden analysis to determine acid-producing,...

Development of the GA-4 and GA-9 Legal Weight Truck Spent Fuel Shipping Casks
General Atomics (GA) is developing two legal-weight-truck spent-fuel shipping casks for transporting commercial reactor spent fuel. The GA-4 pressurized-water-reactor (PWR) and the GA-9...

Design Control Process Requirements for Geologic Repository Operations Area Design
This paper outlines U.S. Nuclear Regulatory Commission's (NRC's) key regulations applicable to U.S. Department of Energy's (DOE's) design...

Design Control Overview fot the Yucca Mountain Site Characterization Project Exploratory Shaft Facility
This paper presents an overview of the design control process used for the Exploratory Shaft Facility (ESF) at Yucca Mountain. Design and design control is a complex, often iterative,...

Application of QA Grading to Yucca Mountain Site Characterization Project Items and Activities
Grading is the act of selecting the quality assurance (QA) measures necessary to develop and maintain confidence in the quality of an item or activity. The list of QA measures from which...

Controlling the Description of a High-Level Radioactive Waste Isolation System
Control of large, complex, regulation-driven programs using traditional management methods has not been wholly effective. What is needed is a rigorous yet flexible method that is amenable...

Product Quality and Process Control in the Windscale Vitrification Plant
The Windscale Vitrification Plant (WVP) is owned and operated by British Nuclear Fuels (BNFL) at the Sellafield Site in England. The purpose of the facility is to condition the high level...

Geologic Sample Handling and Logging at Apache Leap, Arizona
Early in 1990, the Yucca Mountain Project Office (Project Office; presently the Yucca Mountain Site Characterization Project Office) of the U.S. Department of Energy (DOE) completed two...

Application of TQM to the Waste Management QA Regulatory Arena
Over the past several years, a number of the scientists involved with the high-level radioactive waste repository project have expressed concern regarding the application of quality assurance...

Application of QA Program for Yucca Mountain Site Characterization Project Geologic Investigations
The High Level Waste Program requires safe disposal of nuclear waste in a geologic medium for thousands of years. Traditionally, the nuclear industry relies heavily on engineered items....

Management of Comments on DOE's Site Characterization Plan (SCP) and Integration with the Planned Geotechnical Program
The U.S. Department of Energy (DOE) has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on...

Archaeological Program for the Yucca Mountain Site
Archaeological surveys, limited surface collections and selected test excavations in the Yucca Mountain Project Area have revealed four distinct aboriginal hunting and gathering adaptive...

Management and Research of Desert Tortoises for the Yucca Mountain Project
A program has been developed for the Yucca Mountain Project (YMP) to manage and study the desert tortoise (Gopherus agassizi), a threatened species that occurs at low densities at Yucca...

Active Control of Structures with Soil-Structure Interaction
The objective of this paper is investigate the effect of soil flexibility on the performance of the active control system for seismic-excited buildings. By using the critical-mode control...

A Survey of Discrete Variable Optimization for Structural Design
Available methods for discrete variable structural optimization are reviewed. Methods are classified according to three categories: branch and bound, approximations using branch and bound,...

Simultaneous Design and Location of Actuators
A chance constrained model for determining optimal dynamic control parameters for structures subjected to probabilistic forcing amplitudes is presented. Optimal feedback control parameters...

Boston's Sewage Outfall
The centerpiece of the Boston Harbor cleanup plan will be the sewage plant on Deer Island, which will treat water from 43 municipalities in the Boston metro area�500 mgd to start. In order...

Geographic Engineering Management System
The Memphis District Engineering Division is developing a GIS type data base as part of a Geographic Engineering Management System (GEMS) to assist both the District and the Lower Mississippi...

Integration of SCADA and GIS Technologies in Jefferson Parish, Louisiana
Due to its physiographic setting in the delta region of the Mississippi River, a majority of the inhabited lands in Jefferson Parish, Louisiana are below local mean sea level and much...

 

 

 

 

Return to search