Reclaiming the Uncompleted Project of Another Development A-Case Study
This paper will examine the problems encountered when a second organization assumes control of a project from an earlier developer that could not carry the project through to completion....

Staged Water Resource Development Can Improve Economics and Advance Project Implementation
This paper provides reasons for staging, and describes functional types of staged developments, and planning and evaluation of these developments. Many water resources projects can be...

Market Projections for the Hydroelectric Industry
The hydroelectric industry enjoyed a rapid rate of development from 1980 through 1986. This expansion was fed in part by a combination of tax incentives, the PURPA legislation, and high...

Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...

Development of Turbine Intake Downstream Migrant Diversion Screen
Prior to the spring of 1986 Public Utility District No. 2 of Grant County had developed a passive turbine intake screen design. A prototype of this design was placed in the emergency gate...

Protection of Juvenile Anadromous Fish
Protection of juvenile anadromous fish (salmon, steelhead, etc. ) during their seaward migration is a major concern in the Pacific Northwest. The existing screening structures at the head...

Arbuckle Mountain Hydro Vertical-Axis Fish Screens
Fish screens to exclude small fry and debris at remote sites such as Arbuckle Mountain Hydroelectric Plant post unique design considerations to satisfy criteria established by fisheris...

Effects of Selective Withdrawal and Hypolimnetic Releases on Downstream Fish Resources
Selective withdrawal (multilevel outlet) structures on dams can be operated to modify reservoir discharges with the goal of improving downstream water quality and fish resources. A study...

Fish Mortality at a New Low-Head Hydroelectric Plant
A study was developed for the Morrow Plant to investigate the potential for turbine related mortality of entrained fish. Morrow Lake supports a small sport fishery, mainly for smallmouth...

An Approach to Addressing Interactive Effects of Multiple Hydro Projects in a River Basin
Cumulative effects issues continue to arise, not only related to multiple small hydro projects, but also to multiple relicensing of major projects, development of multiple projects at...

The Role of Hydrologic Forecasts and Water Management in Support of Fisheries Enhancement
With the passage of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the adoption of the Columbia River Basin Fish and Wildlife Program in 1982, a new mandate...

Cumulative Impact Assessment: Issues to Consider in Selecting a Cumulative Assessment Method
Because widespread interest in the subject is new, there are no standard or generally recognized methods for cumulative impact assessment. A method should include procedures for (1) evaluating...

Cumulative Impact Assessment: Application of a Methodology
The authors expanded upon the Federal Energy Regulatory Commission's (FERC) Cluster Impact Assessment Procedure (CIAP) to provide a practical methodology for assessing potential...

Environmental Appraisal of Small Hydro Projects in Ontario
Despite a large interest from the developing community and the aid of Ontario's Small Hydro Encouragement Program (Ministry of Energy 1986) which is administrated by the Ontario...

Field Experiences in Improving Water Quality Downstream From Dams
Recent experiences by the Tennessee Valley Authority in improving water quality and fish habitat downstream from dams are presented. At Douglas Dam, floating pumps near the surface of...

Reservoir Releases Improvements?Requiem for Integrating Pollution Control and Resource Management Programs?
To better define the interrelationships between economic growth and development, pollution control, and water resource management, TVA conducted two studies that examined how reservoir...

Instream Flow Values and Power Production
An approach relating the value of water instream to water flow in the stream results in a continuous function of value versus flow. This function is developed using the Physical Habitat...

Downramping to Minimize Stranding of Salmonid Fry
The objective of this study was to develop a downramping regime for the Jackson Hydroelectric Project on the Sultan River in Washington that minimizes the stranding of juvenile salmon...

Project Alternatives to Benefit Endangered Species
In April 1986, the Missouri River Division, U. S. Army Corps of Engineers, determined that operation of the main stem system had the potential to adversely affect the listed species. Consultation...

Instream Flow Methodologies and Requirements
Instream flow is a term applied to the discharge occurring downstream from and at least partly controlled by a dam or diversion structure. The volume and timing of instream flows most...

 

 

 

 

Return to search