Alignment Special Structures for Vancouver's ALRT
This paper describes the special long-span structures, offset columns, and bent structures used in situations where the standardized guideway components used in over 90 percent of the...
Production of Guideway Beams for the Vancouver ALRT
This paper describes the planning, layout and design of a large scale precast plant and innovations in production technology for the fabrication and delivery of 1040 tangent and curved,...
Guideway Beams?Formwork and Fabrication
A manufacturing concept was developed around an adjustable form capable of mass producing prestressed concrete beams to the unique geometric configuration of each section of track. The...
Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...
Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...
Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...
Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...
Downtown People Mover Operating and Maintenance Personnel Requirements
Two major automated Downtown People Mover (DPM) projects, Miami and Detroit, are expected to be in operation within a year. These two DPM systems are similar in many respects: automation,...
Maintenance Requirements of People Mover Systems
The Atlanta Airport Automated Guideway Transit System is comparable to the second or third busiest transit line in the US. The key quality indicators of system performance are discussed...
Toward User-Oriented Failure Management Strategies for the Morgantown People Mover
The Morgantown People Mover (MPM) is the most sophisticated automated people movers in the United States. It is the only one that offers 'personalized' service...
Information Availability
There seems to be a great deal of concern about lack of availability of information concerning the results of failure investigations. In most court cases there is virtually no technical...
Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...
The WMATA Resident Engineer?The Team He Leads and His Responsibilities
This paper discusses the role of the Resident Engineer as a key member of any construction team. It uses the organization and functions as practiced at the Washington Metropolitan Area...
Computer Keeps New Orleans: Head Above Water
The city of New Orleans has been beset with drainage problems since its founding in 1718. A major drainage system was installed in the city in the late 1800s, but it has grown increasingly...
Two Projects Became One
Nontraditional funding and a new law were required before two Cortez, Colo. projects could be combined. Building a new canal and enlarging and lining an existing one to move water in essentially...
Drainage Tunnels Save Freeway Link
A 15 mile section through downtown Phoenix will complete Interstate 10. After years of delay, the project is now close to completion. The project required construction of 6.5 miles of...
Small Water Users�Planning Crisis
Planning to rehabilitate small water systems�both irrigation and municipal water supply�often is ignored. In contrast, planning for new construction and for operations/maintenance work...
Decision Support System for Tunneling
This paper first discusses methodologies for considering geological uncertainty in tunneling projects and for determining the most economic excavation and support methods under such condition;...
A Systematic Approach to Evaluating the Risk of Contractual Disputes
Construction contract disputes along with A/E malpractice actions have raised much concern in the industry. Considerable literature has been written along the lines of claims avoidance...
Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...
Return to search