Rehabbing Bridges Under Traffic
Four urban examples demonstrate how an owner's decision to keep it open during rehabilitation construction forces the designers to contend with an extra set of problems. Reanchoring...

A League of Their Own
New baseball stadiums in Cleveland and Arlington, Tex., opening in April 1994, combine the nostalgia of traditional ballparks with state-of-the-art site planning and structural engineering....

Microsurfacing Urban Pavements
A European maintenance technique called microsurfacing can add years to the service life of cracked, ravelled pavements--with minimal interruption to traffic and for less than half the...

Graphical-Based Productivity Transient Investigation Using DISCO
Construction operations involve complex resource interactions and are typically performed in the field with exogenous factors such as inclement weather conditions and equipment breakdowns....

SCHEREC: SCHedule RECovery System
Creating a revised plan requires experience and significant time. To lessen the effort involved, a knowledge-based system named SCHEREC (SCHedule RECovery) was developed which suggests...

An Integrated Approach To Repetitive Construction Planning
Repetitive construction projects are unsuited for the use of the Critical Path Method (CPM) for their scheduling. Statistical simulation techniques offer a scheduling alternative, but...

Quantification of Cost Uncertainties Using Neural Network Technique
This paper describes the development of a neural network system for forecasting cost escalation in construction. The input of the neural network system consists of factors that have an...

Interpretive and Modelling Problems of Risk and Uncertainty in Bidding Techniques
This paper considers the implementation of policy, strategic and tactical bidding and the processes of devolution of the risk and uncertainty in a corporate management context....

Startplan: Producing Schedule Templates Using IRMA
The Information Reference Model for AEC (IRMA) is a generic information modeling standard to support computer-integrated construction (CIC). Although IRMA is still in a conceptual stage,...

Construction Problem Solving in a Cooperative Distributed Agent Environment
This paper outlines the research being undertaken by the authors to determine how experts develop solutions to construction problems in a cooperative distributed agent environment which...

Improved Computer Simulation of 3D Wind Flow Around a Building
A two-layer method combining the k-? model with the one-equation model near the wall has been tested in computing the wind conditions around a cubic building. In contrast with the simple...

Different Methods to Compute Pollutant Dispersion Around Buildings
Different methods to approximate the advection terms currently in use are reviewed. Holly-Preismann (HP) cubic interpolation using method of characteristics, Chapeau function (CF) method...

Random Vortex Models in Wind Engineering
Random vortex methods are Lagrangian particle-based numerical simulation schemes especially appropriate for Wind Engineering simulations. Vortex methods do not suffer from numerical diffusion...

Intelligent Tutoring Systems to Aid Water Treatment Plant Operators
Training for water treatment plant operators exists primarily through short courses at colleges or technical schools, self-study manuals, and on-the-job training. Intelligent tutoring...

Computer Applications in Liquefaction Analysis
This paper discusses the applications of total and effective stress based computer programs for liquefaction analysis. A total stress based computer program, SHAKE in conjunction with...

The Context?Oriented Model: An improved Modeling Approach for Representing and Processing Design Standards
Current electronic design evaluators employ one of three primary computational models to represent a design standard: the Condition/Consequent, Object-Oriented and hybrid models. The problems...

Object-Oriented Structural Analysis with Substructures
Computer-aided structural analysis is a mature field. However, recent research has produced advances in the areas of automated modeling, multi-processing, and programming techniques. The...

State and Resource Based Construction Process Simulation
Stroboscope is a programming language for construction process simulation. The programming language provides access to the state of the simulation and to the properties of resources. It...

Multi-Objective Optimization of Construction Schedules
This paper focuses on the multi-objective deterministic and stochastic modelling and optimization of construction tasks scheduling. Of particular importance is a frequency need to satisfy...

Linguistic Analysis of Risk in Project Planning
Construction risk analysis models are mainly based on quantitative techniques which require numerical data. However, in many cases, the available information related to uncertainty factors...

 

 

 

 

Return to search