Probabilistic Analysis of Modernization Options
Benefit-cost analysis is a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting...
The Impact of Drought on Hydropower Generation-Case Study of Bureau of Reclamation Hydropower Plant
The paper explores the effects of extended drought on power generation at Shasta hydropower plant, a Bureau of Reclamation facility in Northern California. Statistical measures of water...
Economic Evaluation of Minimum Flow at Rockton
The Rockton Hydroelectric Project is a two-unit, 1,100 kW plant operated by South Beloit Water, Gas & Electric Company, a wholly owned subsidiary of Wisconsin Power & Light...
Renovation and Uprating of Seven Hydropower Plants in Java
The Indonesian Power Authority is planning to renovate and uprate seven hydropower stations in Java to expand plant life expectancy, ensure operating safety and reliability, and increase...
A Case for Modernizing the Funding and Repayment of Regional Water/Power Projects
Several regional water/power projects authorized by Congress remain unfunded and therefore uncompleted year after year. In this paper examples of such uncompleted projects are examined....
Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...
Improving the Assessment of Instream Flow Needs for Fish Populations
Instream flow requirements are one of the most frequent and most costly environmental issues that must be addressed in developing hydroelectric projects. Existing assessment methods for...
Evaluating Hydro Relicensing Alternatives?Impacts on Power and Non-Power Values
The relicensing of 300 hydroelectric plants in the next decade involves a total capacity of about 4,000 MW - a $10 billion value. A methodology recently developed by Decision Focus Incorporated...
Evaluation of an Eicher Fish Diversion Screen at Elwha Dam
In the spring of 1990, the Electric Power Research Institute (EPRI) initiated testing of an inclined fish screen installed in a 9-foot diameter penstock at the Elwha Hydroelectric Project...
A Demonstration of Strobe Lights to Repel Fish
An EPRI review (EPRI, 1986) of fish protection systems for hydroelectric facilities identified strobe lights as a potential behavioral system to minimize fish entrainment. In 1988, EPRI...
Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...
The Use of IFIM for Evaluating Effects of a Flow Alternative on Fish Habitat in a River System with Competing Water Demands
The Instream Flow Incremental Methodology (IFIM) was used to evaluate instream fish habitat in the Platte River in central Nebraska. The IFIM analysis presented herein incorporates 1)...
Altering Federal CVP Power Operations to Accommodate Fisheries' Survival on the Sacramento River
Balancing the needs of the river users, water and power users, and the fishery needs is a formidable task requiring sacrifices by all the users particularly during this time of drought...
Twin Falls Mitigation Plan: Long Term Monitoring of Fish Populations
A fishery monitoring and enhancement plan has been worked out for the Twin Falls Hydroelectric Project which diverts water from a one mile reach of the South Fork Snoqualmie River in Washington...
A Water Budget Approach to Instream Flow Maintenance
Storage reallocation is a current issue at many Federal water storage facilities that have hydroelectric generation. Allocation of storage to support instream flows is one of the changes...
Instream Flow Needs Below Peaking Hydroelectric Projects
A method has been developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly...
Pumped Storage, the Environment and Mitigation
The privately financed 1,000 MW Rocky Point Pumped Storage Project located in central Colorado, USA, will be one of the world's highest head, 2,350 feet (716 m), reversible...
Harvest Facility Protects and Improves Fishery
By constructing a trap and transfer/harvest facility to control anadromous fish migration, the trout fishery on the Boardman River was protected and the salmon fishery was improved. The...
Case Study: Central Oregon Siphon Power Project Mitigating Local Concerns
In the early 1980's, 18 hydroelectric projects were proposed for development on the Deschutes River system in Central Oregon. Strong local opposition was a major factor in...
North Fork Feather River Erosion Control Program
PG&E, an investor owned gas and electric utility serving northern and central California, has been engaged since 1984 in the development and implementation of a regional erosion...
Return to search