Using Threat to Life Studies to Guide Dam Safety Decisions
Ensuring that Bureau of Reclamation (Reclamation) dams do not present unacceptable risks to public safety, prosperity, and welfare serves as a primary objective of Reclamation's Safety...
Economic Aspects of the Bureau of Reclamation Safety of Dams Program
The paper briefly examines economic aspects of the Bureau of Reclamation (Reclamation) Safety of Dams (SOD) program evaluation process. Procedures described include the downstream damage...
Reclamation's Design Process of Early Warning Systems for Dam Safety
This paper discusses the Bureau of Reclamation's process for designing the detection and decision making components of an Early Warning System (EWS) for dams with hydrologic deficiencies....
Emergency Action Plan
Although most dam owners have a high level of confidence in the structures they own and are certain their dams will not fail, the Bureau of Reclamation (Reclamation) included, history...
Scour Prediction Model at Bridge Abutments
A model to predict local abutment scour is presented. The model is based on a large number of laboratory experiments over the past half century. The dependent variable, a ratio that includes...
Assessment and Prediction of Debris-flow Hazards
Study of debris-flow geomorphology and initiation mechanism has led to better understanding of debris-flow processes. This paper reviews how this understanding is used in current techniques...
Research Needs for Debris Flow Disaster Prevention
A 'soft' disaster reduction strategy is proposed based on identification of hazard location, extent and maximum intensity; monitoring of antecedent catchment moisture, sediment and vegetation...
Debris Flows and Mass Wasting in Volcanic Torrents
Observation of debris flow and topographic survey for mass wasting in the volcanic torrents clarified that (1) mass wasting processes such as rock fall from the side-wall and toppling...
Interpreting Debris-Flow Hazard from Study of Fan Morphology
The deposits, stratigraphy, and surface morphology of debris-flow fans are a record of past debris-flow activity, and as such can provide useful information about debris-flow hazards....
Fish Screen Developments, Columbia River Dams
This paper describes developments to date for a fish diversion and bypass system being tested for two Columbia River dams. Because of the concern for the negative impacts of screen systems...
Model Study of Center Hill Fuse Plug Spillway
Model tests of a fuseplug spillway mounted on the fixed crest of an embankment dam were conducted to develop a satisfactory design that would fail in a orderly fashion at a prescribed...
Riprap Design at Bridges?Factor of Safety Approach
The factor of safety method offers a physically based methodology for design of riprap that relates the applied shear stress on the channel boundary to the stability of the riprap layer....
Confirmation of Seismic Safety at Stafford Dam
A critical aspect of the North Marin Water District's mission to maintain reliable water supply facilities and water service is periodic assessment and re-evaluation of the seismic safety...
Mapping Debris-Flow Hazard in Honolulu Using a DEM
A method for mapping hazard posed by debris flows has been developed and applied to an area near Honolulu, Hawaii. The method uses studies of past debris flows to characterize sites of...
Structural and Non-Structural Debris-Flow Countermeasures
Debris-flow can potentially occur for almost any torrents whose gradient is steeper than a given critical value and the frequency at which the debris-flow occurs depends on geological...
Large-Scale Embankment Overtopping Protection Tests
The U.S. Bureau of Reclamation (Reclamation), Colorado State University (CSU), and the Electric Power Research Institute (EPRI) have an ongoing cooperative research effort to determine...
Progressive Failure of an Overtopped Embankment
The failure of an overtopped embankment is a problem of a very complicated nature. Concerned organizations are interested in information that can be used in future planning and development...
A New Type of Concrete Trapezoid Dam
A new type of 128.0 m height concrete trapezoid dam (t-d) has been built for the Wunana Town Hydroelectric Power Station (WTHPS). The paper presents its optimum section design, several...
Assessing the True Value of Flood Control Reservoirs: The Experience of Folsom Dam in the February 1986 Flood
Over the last 40 years considerable public investments have been made in large flood control storage reservoirs throughout the U.S. and internationally. These projects were typically designed...
Chatuge Hydroproject Aerating Infuser Physical Model Study
The Tennessee Valley Authority is investigating the feasibility of a dual purpose reregulation and aeration weir to increase the dissolved oxygen in water releases and to provide continuous...
Return to search