Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...
Electronic Communication Between Project Participants
Fragmentation in the U.S. construction industry is perceived as one of the major contributors to reduced productivity. Lack of communication may be the main difficulty. Communication is...
Surface Renewal Due to Large Flow Structures in Open Channel Flow
It is shown that under certain flow conditions, surface renewal cannot be understood as an exclusive result of the bursting occurring near the wall, as proposed by several authors. Flow...
Gas Transfer at Hydraulic Structures
The objective of this paper is to identify and briefly summarize the state-of-the-art in measuring and describing gas transfer at hydraulic structures. Basic theory of mass transfer at...
Sidestream Elevated Pool Aeration Station Design
The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) is constructing a system of five Sidestream Elevated Pool Aeration (SEPA) stations along the 35.8 mile Calumet River,...
Ground Stabilization in Shallow Depth Soft Ground Tunneling
A new approach was employed for ground stabilization to drive a semi-circular cross-section tunnel with overall dimensions of 24 ft (7.3m) wide, 12 ft (3.7m) high, and 164 ft (50.0m) long....
Predicting Sedimentation in Shallow Draft Coastal Ports
The U.S. Army Engineer Waterways Experiment Station is conducting a study to develop and improve design guidance for shallow draft coastal ports. As part of this effort and to fill gaps...
Riverbank Renewal
In Providence, project teams from the public and private sector worked side-by-side, rerouting two rivers and constructing a new corporate headquarters. What made the task more challenging...
Detection of and Construction at the Soil/Rock Interface
This proceedings,
Pumping Oil, Treating Soil
Oil was discovered on hilltop land in Signal Hill, Calif., in 1921, setting off one of the most wild land rushes the state has ever seen. Some 70 years and 20,000 oil wells later, the...
Rethinking Flood Control Channel Design
Until recently, the standard method of flood control was channelization�converting a natural stream to a uniform channel cross section. But this single objective approach is coming under...
Monitoring Vibration
Vibration monitoring for construction projects is increasing rapidly. Instrumentation for measuring structural response to blasting began in the mining industry with research by the U.S....
Rehabilitation of Rapidly Urbanizing Streams
DuPage County, Illinois is implementing a stream maintenance program with the purpose of restoring and preserving the hydraulic efficiency of its streams and drainageways. The program...
Soft Bottom Low Flow Channel?A New Approach
In 1987, the City of Boulder, Colorado requested assistance from the Urban Drainage and Flood Control District (District) to repair a problem of cattails growing in the low flow portion...
Creede, Colorado?Channel Rehabilitation
The existing grouted stone channel in Creede, Colorado, is approaching the end of its useful life. The channel is subjected to repeated freeze-thaw cycles causing spalling of the grout...
Sediment Management Challenges of the Red River Waterway Project
The Red River Waterway project consists of channel stabilization and construction of navigation locks and dams to provide a 9 foot minimum depth for a distance of approximately 236 miles,...
Resistance Coefficient in a Tidal Channel
In applying a numerical hydrodynamic model to the tidal channel-lagoon complex around Great Sound, New Jersey, it became apparent that the model guidelines for the resistance coefficient...
Two-dimensional Modelling of the Bristol Channel, UK
A two-dimensional depth-averaged numerical hydrodynamic model of the Bristol Channel and Severn Estuary has been developed to investigate the effects on water quality of existing and new...
Impact of Urbanization on Main Stream Flooding
The methodology, results and management implications of a stormwater study at an urban watershed experiencing increasing episodes of flooding along the main channel and flood plain are...
Morphology and Roughness in the Hydraulics of Large Bed Element Channels
The evolution of natural steep channels is a function of two factors in accordance with the principle of least action: flow distribution in the channel and terrain geomorphology. Large...
Return to search