Non-Federal Development at Federal Dams
This paper describes the recent participation of the Southwestern Division (SWD) of the Corps of Engineers in non-Federal development of the hydropower potential at existing Corps projects...

Licensing a Hydroelectric Power Plant at Navajo Dam
A hydroelectric power plant at the base of Navajo Dam was envisioned by the Bureau of Reclamation and the Bureau of Indian Affairs to support the development of the Navajo Indian Irrigation...

Marketing a Public-Private Small Scale Hydro Project: Case History, Kent County, Michigan
In 1982, Kent County, Michigan faced an interesting dilemma. Back in 1965, they had purchased the Fallasburg Dam and powerhouse from Consumers Power Company for 1. Without putting funds...

Effects of Selective Withdrawal and Hypolimnetic Releases on Downstream Fish Resources
Selective withdrawal (multilevel outlet) structures on dams can be operated to modify reservoir discharges with the goal of improving downstream water quality and fish resources. A study...

Field Experiences in Improving Water Quality Downstream From Dams
Recent experiences by the Tennessee Valley Authority in improving water quality and fish habitat downstream from dams are presented. At Douglas Dam, floating pumps near the surface of...

Instream Flow Methodologies and Requirements
Instream flow is a term applied to the discharge occurring downstream from and at least partly controlled by a dam or diversion structure. The volume and timing of instream flows most...

Water Management for Juvenile Fish Passage
The regional goal of restoring upriver runs of adult salmon and steelhead requires increased survival of the juvenile fish migrating to the ocean. Juvenile fish survival requires: (1)...

Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...

A Case for Selecting Only Deterministic Spillway Design Floods for High Hazard Dams
The Federal Energy Regulatory Commission has under license or exemption from licensing more than 2000 hydroelectric dams. The Office of Hydropower Licensing published, in September 1986,...

Repair of The Hinckley Dam Embankments
The New York Power Authority was licensed in 1982 to construct and operate a 9 Mw hydroelectric facility at the existing Hinckley Dam near Utica, New York. Soil exploration programs undertaken...

Roller-Compacted Concrete for Dams
This paper summarizes the findings of an investigative report on roller-compacted concrete dams prepared by Morrison-Knudsen Engineers, Inc. (MKE) under contract to the Electric Power...

Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...

Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...

Designing a Modern Small-Scale Hydroelectric Plant
STS Consultants, Ltd. (STS) and Skidmore, Owings & Merrill (SOM) successfully teamed on four hydropower sites in Michigan during the 1980's. Three of the four sites...

Milltown Powerhouse Rehabilitation
The Milltown Powerhouse and dam are over 80 years old. The powerhouse and other structures were built in 1906 and are owned by the Montana Power Company. The plant is located on the Clark...

Modern Technology in an Ancient Environment?The Answan II Power Plant
The Aswan II power plant is located at the old Low Aswan Dam in Southern Egypt. This dam was constructed in the early years of the century in order to provide irrigation water for cash...

Large Capacity Rock Anchors Stabilize Bagnell Dam
Evaluations of spillway discharge capacity and stability of structures for the Osage Hydroelectric Project indicated that the Project was unsafe during the occurrence of the Probable Maximum...

The Rehabilitation of Lake Harriet Dam
In 1984, the decision was made to rehabilitate the Lake Harriet Dam. The existing arch dam structure was encased with a rockfill buttress. The downstream buttress, which also acts as a...

Cedar Falls Project?Major Rehabilitation
This paper presents planning objectives and operational considerations which governed the design and construction of a major rehabilitation project implemented at the City of Seattle's...

Green Mountain Power Corporation Bolton Falls Hydroelectric Project
The project proceeded through preliminary design, FERC licensing, and into detailed design, following its selection as one of seven low-head redevelopment projects to be partially funded...

 

 

 

 