Performance Evaluation of Channels Stabilized with ARS-Type Low-Drop Structures
Field and hydraulic investigations of seven ARS-type low-drop grade-control structures located in Mississippi indicate that most of the structures become submerged during flows with recurrence...

Gas Transfer at Hydraulic Structures
Field measurements of gas transfer at hydraulic structures are notoriously difficult and imprecise. A technique which measures the transfer of hydrocarbon tracer gases has been tested...

Uncertainty and Value Analysis in the Selection of Dam Modification Alternative
Objectives and attributes were decided by the dam and watershed requirements, value judgments of decision makers, quantified trade-offs between different attribute values, and technical...

Dam Safety, Yes.; But What About Safety at Dams?
Design and construction of safe structures are the professional obligations of hydraulic engineers. However, there are environmental dangers with safe structures which engineers often...

Hydraulic Effects on Swimming Fish in Fish Passage Structures
The implications of profile drag, weight, and buoyant forces on energy and power requirements of fish swimming through fish passage structures are considered. Where hydraulic grade lines...

Flow Through Fish Bypass Intakes
Hydraulic and computational fluid dynamic models were used to investigate the cause of the unequal intake flow distribution observed entering the three vertical intakes of the patented...

Physical Model of Local Scour at Grade Control Structures
A physical model of local scour occurring at grade-control structures was operated at an undistorted Froude number prototype-model scale ratio of 1:4. The maximum unit discharge in the...

Design of Riprapped Scour Holes for Flip Bucket and Overfall Spillways
Presented in this paper is a simple method of predicting pre-excavated scour depths and geometry for riprapped basins below flip bucket spillways. The input data needed for establishing...

A Numerical Solution Technique for Incompressible Flow
Presented is a numerical solution technique which employs the explicit predictor-corrector scheme of R.W. MacCormack in solving the governing two-dimensional equations of motion on a staggered...

Debris-Flow Research and Engineering Practice
For debris-flow analysis to enter standard engineering practice, future research must extend existing models to deal with major complications that arise in field practice. This paper reviews...

Density Currents and Their Application in Hydraulic Engineering: Task Committee Progress Report
The Task Committee on Density Currents and Their Applications in Hydraulic Engineering operates under the Technical Committee on Hydrologic Transport and Dispersion. The Task Committee...

Identification of Automation Opportunities
Construction, although the world's largest industry, is also its most archaic. Most construction practices are very labor-intensive, with resulting impacts on safety, productivity,...

Terrestrial Trends for Building Technology in North America
This paper discusses new building technologies that will develop in the early 1990's to become significant technologies by the mid 1990's. The perspective is...

Constraints on Lunar Base Construction
This article discusses the development of scenarios and designs for the construction of a lunar base or network of bases, which will require close attention to the natural and human constraints...

Concrete Lunar Base Investigation
Scientific and industrial operations on the moon require suitably shielded structures. Small structures for limited scientific activities may be constructed from structural elements prefabricated...

Lunar Cements/Concretes for Orbital Structures
The lunar surface is a rich source of inorganic building materials for large space structures. Lunar anorthosites can be processed into calcium aluminate cements in high temperature, high...

Concrete Habitable Structure on the Moon
This paper presents construction methods for a concrete habitable structure on the Moon. The study was conducted on the assumption that a concrete manufacturing plant has already been...

Construction Operations for an Early Lunar Base
Construction and excavation operations performed during the earliest stages of a manned lunar base pose a unique set of problems. This paper will describe six construction tasks that are...

A Methodology for Modeling Construction Requirements for a Manned Lunar Base
Before accurate modeling and planning of a manned lunar base can be accomplished, a methodology representing the construction-and-assembly process of lunar surface facilities must be developed....

Transportation by Pipelines in Space Colonies
The use of pipelines in space colonies to transport liquid, gas, solids and even passengers is not only feasible but also desirable. For many applications, pipelines offer a number of...

 

 

 

 

Return to search