Predicted and Measured Behavior of Five Spread Footings on Sand
This publication contains the results of a full scale load testing program used to predict and measure the bahavior of five spread footings on sand. These results were presented at the...
Standard Practice for Direct Design of Buried Precast Concrete Pipe Using Standard Installations (SIDD)
This publication, Standard Practice for Direct Design of Buried Precast Concrete Pipe Using Standard Installations (SIDD), (ASCE 15-93), is applicable to buried concrete precast pipe intended...
Vertical and Horizontal Deformations of Foundations and Embankments
This proceedings,
Aviation Crossroads
Challenges in a Changing World
This proceedings,
Critical Issues in Water and Wastewater Treatment
This proceedings,
Modelling of Flood Propagation Over Initially Dry Areas
This proceedings,
Upgrading Dubai's Sewers
The sewerage system serving the city of Dubai in the United Arab Emirates, is plagued with odor and corrosion problems. System elements were deteriorating and failure rates were increasing....
Safety at the Site
The engineer should not be responsible for safety at the construction site. Most standard contract documents allocate this responsibility in construction means, methods and sequences to...
Deep Dig, Tight Squeeze
Since it opened in 1928, the North Station/Boston Garden Complex has secured a firm place in local history. Boston Garden, home of the Bruins hockey and Celtics basketball teams, has been...
The Key is Constructability
Construction generally involves the collective efforts of owners, designers, contractors and suppliers. During the design phase, the engineer should be mindful of such critical elements...
Pregame Show
The 1996 Summer Olympics are still two years off, but Atlanta's painstaking preparation is in full swing. One key element is a carefully crafted construction program. The...
Planes, Trains and the Games
Olympics-related construction in Atlanta isn't limited to sports facilities. The city is also gearing up for the 1996 Summer Games by accomplishing some major transportation infrastructure...
Japan Builds 21st Century Monuments
Japanese civil engineers are designing and constructing an extensive array of 21st century landmarks that incorporate innovative technology applied to industrial restructuring, advanced...
The New Clark Bridge: Saddle-Draped Cables
The new $85 million, 108 ft wide Clark-Bridge replaces a 20 ft wide 1928 truss bridge at Alton, Ill., carrying US 67 over the Mississippi about one mile above the recently completed Lock...
Advances in Cement and Concrete
This proceedings,
Fundamentals and Advancements in Hydraulic Measurements and Experimentation
This proceedings,
Hydraulic Engineering
These proceedings,
Marinas, Parks and Recreation Developments
This proceedings,
Planning and Design Guidelines for Small Craft Harbors
Risk-Based Decision Making in Water Resources VI
This proceedings,
Return to search