Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Terminal 18 Entry Facility?Port of Seattle
This paper presents a successful approach that was used in the planning, design, permit coordination, and expansion of the entry/exit facilities at Terminals 18 and 20 at the Port of Seattle....

Port Expansion of Eastport, Maine
A recent pier expansion now allows Eastport to provide 40 feet of water at low tide. The pier expansion consists of a concrete-decked steel pipe pile-supported extension to an existing...

Tacoma Terminals Pier Designed for Economy
This pier is a representative and highly refined sample of what is known as the Puget Sound system of construction, an economical system that maintains the durability necessary in the...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Marina Design and Environmental Concern
Research initiated by a Florida Cabinet Resolution of August 6, 1974, has generated two models for the evaluation of the impact of marina development on coastal waters. One, a complex...

Siltation of the Port of Astoria
Sedimentation rates suddenly increased in the Port of Astoria, Oregon, immediately following the May 18, 1980 ash eruption of Mt. St. Helens. This ash was transported down the Columbia...

Port of Long Beach Supertanker Terminal
The supertanker marine terminal and crude-oil transfer facility at Berth 121 on Pier E in the Port of Long Beach, California is the largest tanker-handling berth on the West Coast. This...

The Pacific Texas Pipeline Project?Deepwater Oil Terminal, Port of Los Angeles
This paper describes the implementation program and status of the Pacific Texas Pipeline Company project in the Port of Los Angeles. A brief description of this important 1. 6 billion,...

Terminal Development as Affected by New Generation Ships
Howland Hook Marine Terminal, New York, serves to illustrate how an existing terminal, built to the older standards, can be adapted to accommodate these larger ships that not only stretch...

Prestressed Concrete Piling?Design vs. As-Built
The proper design, manufacture, handling and installation of prestressed concrete piles is essential to their structural integrity and long life. A quality control program must be designed...

Perforated Wave Barriers in Small Boat Piers
Perforated breakwaters can be used to reduce the energy and the height of waves entering small boat harbors. By not extending the breakwater to the bottom interference with littoral drift...

Design Concepts for Floating Breakwaters
This paper describes a fundamental approach to the design of a floating breakwater based on the concepts of dynamic analysis of floating bodies. The process results in a relatively simple...

Fisherman's Wharf Breakwater Design and Construction
Fisherman's Wharf Breakwater is a precast prestressed concrete structure presently under construction. It consists of vertical sheet piles braced at the top by batter piles....

Dual Hoist Container Cranes for Virginia Port Authority
The dual hoist container crane has proven to be substantially more productive than conventional container cranes. Virginia Port Authority has purchased three new dual hoist cranes with...

Container Wharves Supported on All Vertical Piles Embedded in Rock-Fill Dikes
In recent years, several container wharves have been planned and/or constructed which feature the construction of the wharf over a sloping rock-fill dike. The wharves utilize all vertical...

Berthing Impact Force Distribution on Pile Supported Pier Structures
This paper investigates the degree to which a berthing impact force is distributed to the pile bents of batter pile supported pier structures. A procedure is developed to estimate the...

Waterfront Parks in the Boston Area
Two recently completed waterfront parks in Cambridge and East Boston, Massachusetts are discussed. The Bird Island Flats 'Harbor Walk' project is a 15-foot wide,...

A Multi-User Fender Design and Installation
The increase in damage frequency to the existing Timber Fender System during the change-over from military to commercial/industrial users resulted in a call for design solutions from the...

Lessons Learned from the Certification of Graving Docks, Marine Railways, Vertical Lifts and Shipbuilding Ways
Because of the hazards which exist during the ship docking, undocking, launching and while the ship is being built or repaired, the Navy has determined a requirement exists for system...

 

 

 

 