Design of Isolated Small Hydro Stations
This paper presents some ideas concerning the criteria for the design of small hydro power stations operating isolated, and specially those to be installed in remote areas. Subjects covered...
A Comparative Hydraulic Model Study of an Orifice Spillway
The results of a hydraulic model study to investigate the feasibility of using an orifice spillway at a generating station in northern Manitoba, Canada are presented. It has been suggested...
Flow Characteristics in an Irregular Spillway Model
A physical model of the spillway for a proposed water supply reservoir near Meridian, Texas, was constructed to determine the optimum spillway design which would maintain an acceptable...
Hydraulic Model Studies - Sidney A. Murray Jr., Hydroelectric Plant
The power plant is located at the Old River Control of the Lower Mississippi River (Louisiana). It consists of an intake channel about 5000 ft long, a power plant with eight bulb units...
Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...
Newfoundland's First Arch Dam Construction Versus Climate
Paradise River arch dam is located in a narrow box canyon about 50 m deep and less than 10 m wide at streambed. It is a thin arch dam, especially sensitive to temperature loads, thus contraction...
Problems Associated with Large Hydro Generators
Since the early 1950s, hydro generators have increased in size from the 50 MVA range to much larger units employed today, many of which are in excess of 500 MVA. Such a tenfold increase...
Critical Features of Custom Design Hydro Gates
Large hydro gates are custom designed to suit each particular installation. To prevent overlooking a feature that could lead to future problems, a check list of the numerous features should...
65 MW Bulb Turbine Generating Unit for Tadami Project
The Tadami Hydro-electric Power Project (Tadami Project) of the Electric Power Development Co., Ltd. (EPDC) - Japan is now under construction and is scheduled to be in commercial operation...
From Guesswork to Guarantee?
Maser describes a project to determine the effectiveness of radar and infrared thermography in detecting deterioration of asphalt overlaid bridge decks. The project, sponsored by the New...
Detecting the Defects
According to estimates, for every dollar spent on preventive maintenance of the infrastructure, $10 will be saved by avoiding emergency repairs after major structural failures. Technologies...
Seismic Codes:Preparing for the Unknown
Few eastern communities follow seismic codes because few communities view earthquakes as a risk. Although California-sized quakes have hit Charleston, St. Louis, they've done...
The Great Quake: On Site Reports
Written within two weeks of the Oct. 17, 1989 California earthquake, these comments cannot be considered definitive. But they do stress two points: 1) Earthquake codes do work. Buildings...
The Simulation of Variable Release Temperatures from the Rock Creek-Cresta Project Using the USFWS Instream Temperature Model
Pacific Gas and Electric Company (PGandE) operates the Rock Creek-Cresta Project on the North Fork Feather River (NFFR) for hydroelectric generation under authority of Federal Energy Regulatory...
Feasibility of Cold Water Releases from Lake Britton
The Pit River in Shasta County, California, is the site of the Pit 3, 4 and 5 Project, a major hydroelectric facility operated by the Pacific Gas and Electric Company (PGandE) under Federal...
Simulation of the Stanislaus Project: Performance of the U.S. Fish and Wildlife Service Instream Temperature Model on a Complex System
The primary objective of the study was to characterize the temperature regime of the MFSR Middle Fork Stanislaus River and determine the effect of alternate release flows on stream temperature...
Reliable Operation of Hydro-Thermal Power Systems
The demonstrated model allows planners to account for both operating and shortage costs, subject to a constraint on the system failure rate. In addition, the optimal long-term operation...
A Short-Term Hydro Scheduler for Hydro-Thermal Power Systems
This paper presents HYDSIM (Hydro-electric Simulation), a new versatile computer model developed to simulate the hourly or daily operation of a large network of multi-purpose reservoirs...
Computerized Operation Models of Oroville Reservoir
Two monthly computer operational models, OROTHM1 and OROTHM2, were developed to provide more detailed operation and maintenance studies for the Oroville facilities. Currently another computer...
Independent Turbine Testing and Research
The St. Anthony Falls Hydraulic Laboratory (SAFHL) is presently upgrading their Turbine Test Facility. Completion of the upgrade, including checkout tests, is scheduled for Fall 1987....
Return to search