Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...

Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....

Specifying Trench Safety: the Texas Experience
The frequency of accidents during trenching operations has grown so dramatically that the issue has caught the attention of both industry 'insiders' and 'outsiders.'...

Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Traffic Deck Over Braced Excavation
A case history is used to examine the planning, design, and installation of a temporary traffic deck over a 23-foot-deep braced excavation. The deck was installed in a three-phase sequence...

Construction Accident Analysis: The Inductive Learning Approach
This paper presents the use of inductive learning in the analysis of construction accidents. It provides a brief description of ROUGH, an inductive system based on the theory of rough...

The CRANIUM: A Case Study of Sensory Improvement for Construction Equipment Operators
Machines excel at physical processes such as generating large forces and performing repetitive motions, but humans are still better at information intensive processes such as planning,...

Construction Quality Management
The Resident Management System (RMS) is a microcomputer based quality management and contract administration system designed specifically for resident engineers, by the Los Angeles District,...

The Liability Crisis-Revisited
The 'liability crisis' of the 1980s which has affected engineers and other professionals in a significant way is considered. A number of theories or opinions...

Safety in the Construction Industry
Although the construction industry employs only 5% of the workforce, it comprises 20% of all accidents and 26% of all occupational related fatalities. The costs of acidents is 9 billion...

State and Local Issues in Transportation of Hazardous Waste Materials
Towards a National Strategy
This proceedings contains papers presented at the specialty conference State and Local Issues in Transportation of Hazardous Materials: Towards a National Strategy held on May 14-16, 1990...

The Debate Over Large Dams
Dam megaprojects across the globe are under increasing scrutiny. Critics say large dams have clearly lost their luster. While the outcry over huge public subsidies and high ecological...

Building Green
Some scientists say polystyrene insulation may be responsible for up to 40% of the ozone depletion caused by CFCs. That's only one reason why construction and design professionals...

Construction Documents Revised
The Engineers Joint Contract Document Committee has produced revised documents, which are available from ASCE. The committee includes ASCE, the National Society of Professional Engineers,...

Taller Tunnels
Between 1984 and 1991, Shannon & Wilson, Inc., Seattle, designed renovation programs for more than 25 mi of tunnels for four western railroads. We performed all of this work under...

Quake-Safe Housing, Again
Because so little data exist about earthquake behavior of buildings that have been strengthened to meet seismic codes, many engineers are curious about the Hotel Oakland in California...

Construction under Fire
Construction is not carried out in a laboratory setting under controlled conditions�especially in areas of socio-political conflict, such as El Salvador in the 1980s. Instead, the construction...

Liquefaction Hazard Evaluation: Methodology and Application
Deterministic liquefaction potential evaluations are commonly done in engineering practice and several probabilistic models exist. In this paper an extended method is described that combines...

Seismic Hazard Analysis of Buried Pipeline for Design
This paper concerns mainly the following three items on seismic hazard analysis of buried pipeline for design: (1) effects of pipeline length on risk, (2) effects of local site conditions...

Wellington's Lifelines in Earthquake Project: An Outline of a Major Review
This paper outlines a project involving a major review of all lifelines including building services in the region of Wellington, New Zealand. A case study approach was used involving representatives...

 

 

 

 