Long Lake Dam Model Studies
The Long Lake spillway was designed at the turn of the century as a standard ogee section with an upstream batter for a maximum head of 179 feet (55 m). It did not include any energy dissipator....

Hydraulic Design and Performance of Discharge Facilities at Revelstoke Project
Revelstoke Project is located in southeastern British Columbia on the Columbia River, 130 km downstream of the Mica Dam and approximately 5 km north of the City of Revelstoke. The project...

Layout of a Powerhouse Adjacent to Lock and Dam Structures
An approach flow to a powerhouse intake adjoining existing lock and dam structures may cause a significant reduction in the efficiency of the powerhouse and give rise to an economically...

Low Head Hydraulic Model Justifies Cost
In many cases, developers of low head hydroelectric plants fail to use physical hydraulic modelling as a tool in the design process. Economic constraints are often cited as the primary...

Pit Turbine Technology for Low Head Hydro Projects
Manufacturers of hydro generating equipment have developed designs that are adaptable to existing dams and suitable for upgrading and redevelopment of existing hydro plants. The pit turbine...

A Lesson in Repairing Cracked Kaplan Blades
Each of the three units that failed at Bonneville Lock and Dam started with a fatigue break and ended in a brittle fracture. Consequently, a comprehensive in-house weld procedure was developed...

Racine?5 Years of Successful Operating Experience with the World's Largest Bulb Turbines
In September 1982 two bulb turbine generating sets with a runner diameter of 7700 mm and a generator rating of 25 MVA were put into commercial operation at the Racine dam on the Ohio river....

Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part A: Failure Investigation and Lessons to be Learned
A lightning strike caused electrical failure at Spokane's two Upriver power plants, resulting in the river overtopping Project embankments, and causing nearly 11. 5 million...

Rehabilitation of TVA's Great Falls Project
After seventy-one years of productive service, this two-unit, 31,860 kV plant is undergoing a major rehabilitation. The deterioration of the project has been of concern since the beginning...

Echo Dam Small Hydrodevelopment
In the mid 1970's, Bountiful City Light and Power began investigating alternative energy sources to furnish power to their distribution system. They engaged the firm of Bingham...

Roller Compacted Concrete Dams?An Overview
The development of roller compacted concrete for gravity dams is traced from forerunners, through its use at the Shihmen and Tarbela Dam Projects to Willow Creek Dam and the Japanese Roller...

Planning, Design and Cost Estimates for RCC Dams
Engineers, planners, and officials of agencies responsible for developing water resource projects are confronted with preparing preliminary designs and cost estimates for dams. This paper...

Cedar Falls Roller Compacted Concrete Dam
This paper presents the design, material testing, quality control, and construction considerations applicable to a small Roller Compacted Concrete (RCC) dam. The Cedar Falls RCC dam is...

A Combined RCC and Reinforced Concrete Spillway
Stacy Dam features the latest evolution in the use of roller compacted concrete for construction of spillways. Because of unusual site conditions, RCC will be used in three different parts...

Design of Seepage Control Systems for RCC Dams
As the reservoirs of the first generation of roller compacted concrete (RCC) dams have been filled, several have exhibited significant amounts of seepage, a fact that has been of concern...

Behavior of Completed RCC Dams
Enough roller compacted concrete dams have been completed to allow an overall evaluation of this new approach to construction. Performance has been good. No operational restrictions have...

Strengthening and Raising Gibraltar Dam with RCC
The initial phase of a multiphase investigation program was completed by USBR (U. S. Department of the Interior, Bureau of Reclamation) personnel to develop geotechnical laboratory testing...

Compaction Parameters of Roller Compacted Concrete
Density in roller compacted concrete is usually achieved through vibratory compaction. Factors of major influence in attaining densification of a structure with a vibrating roller are...

Compaction Characteristics of Roller Compacted Concrete
This paper describes a fundamental study on the compaction characteristics of Roller Compacted Concrete (RCC) in the fresh state during vibration through a laboratory test and a field...

Comparison of Joint Shear Strengths for Conventional and Roller Compacted Concrete
Direct shear test data for parent material and bonded and unbonded jointed specimens of conventional and RCC (roller compacted concrete) are presented and compared. Results are discussed...

 

 

 

 

Return to search