Design Criteria for Lunar Construction Equipment
It is anticipated that lunar installations will, from the beginning, require moving and assembly of components and the use of lunar regolith as a construction material. The functional...
Future Launch Systems: The Policy Challenge
A review of the literature and discussions with military, commercial, and NASA representatives shows that all users agree we need new systems, but there is no agreement on which to pursue....
ARIANE-5 Launch Operations Construction and Operation of a New Launch Complex for Lower Cost, Higher Reliability Missions
This paper describes the main criteria driving the evolution of these facilities : launch rate, vulnerability to accidents, reliability and safety, cost optimization and adaptation to...
Puerto Rico Privatizes the Roads
The opening of Puerto Rico's Teodoro Moscoso Bridge in San Juan early in 1994 will usher in a new era of privately financed toll roads. The first product of the 1989 Private...
Effective Project Planning Techniques
Setting tabular and graphic standards for the presentation, storage and handling of project-related data from the start can make the job of managing, scheduling and documenting a project...
Recent Developments in Seismic Response of Composite Structures
Lack of sufficient data has limited a wider application of structures using mixed steel-concrete construction in seismically active regions. This paper summarizes some recent studies at...
Talmadge Bridge Replacement
This paper discusses the design of the main spans and approach spans for the replacement of the Talmadge Bridge for the Georgia Department of Transportation. The design of the concrete...
Making an Olympic Stadium and a Baseball Park
A new dual-purpose stadium which reflects not only the classical origins of the Olympic Games, but also the tradition of baseball, is the architectural centerpiece for the 1996 Centennial...
Case Study - Performance of Diaphragm Walls During Construction; Predictions vs. Field Measurements
Rigid diaphragm walls (slurry walls) are being used more than any other earth supporting system for underground construction projects in confined downtown sites throughout the United States...
Stability of Lift Slab Structure During Construction Stage
The lift slab structures impose stability problems during the construction phase. The process of constructing this type of structure requires placing the masses of the floor slabs at a...
Monitoring Stay Cable Forces During Construction of the Natchez Trace Parkway Arch Bridge
This paper describes how cable-stay forces were indirectly quantified through the use of simple field measurements. A system was developed and delivered to the contractor and used to make...
Comparison of Bridge Deterioration Rates
This paper presents the results of a study of rates of deterioration of steel and prestressed concrete bridge superstructures. The results indicate that age is the primary determinant...
Multimedia Technology and Structural Steel Design
A project is underway at The Pennsylvania State University to produce Steel Design Educational Module (SteelDEM) software. This intelligent tutor and teaching aid utilizes the state-of-the-art...
Seismic Research Program for Highway Construction
This paper provides an overview of the highway research program being conducted by the National Center for Earthquake Engineering Research (NCEER). This six-year program, which is sponsored...
Harmonization of Reliability-Based Timber Engineering Codes and Standards
An overview of activities related to harmonization of reliability-based timber design codes and standards is presented. The overview is based on information generated through a NATO Advanced...
Use of Composite Timber-concrete Floors in Residential Buildings
Timber-concrete floors are widely used in the Gulf region for its resistance to hot and aggressive environment of the area. However, due to the fact that no shear connector is provided,...
The Canadian Approach in the Design of Wood Structures: Conversion to Limit States Design
During the early 70's, the National Building Code of Canada (NBCC) established the principle that structural design be carried out using the limit states design (LSD) method. The technical...
Strength Variability of Wood Formwork Members
Failure of concrete formwork is one of the main causes of concrete construction failures. Among the main causes of formwork failure is inadequate strength. Currently there is no published...
LRFD Provisions for Wood Bridges
A project to develop a load and resistance factor design (LRFD) edition of the American Association of State Highway and Transportation Officials (AASHTO) Standard Specifications for Highway...
Development Length of Uncoated Prestressing Strand
The Federal Highway Administration is conducting ongoing research which investigates the development length of uncoated and epoxy coated prestressing strand in prestressed concrete members....
Return to search