Erosion of the Slopes of Gold Tailings Dams
A study has been made of rates of erosion from the slopes of gold-residue dams in the South African Highveld region. Data is available for two years at this time and conclusions must therefore...
Analysis of Plastic Soil in Contact with Cavitose Bedrock
A numerical analysis has been conducted to evaluate the stress deformational response of highly plastic soils in contact with cavitose Bedrock. The numerical idealization represents the...
Plastic Concrete Cutoff Walls
The studies revealed that plastic concrete can be prepared having a coefficient of hydraulic conductivity that is less than 1 multiplied by 10** minus **7 cm/sec. The shear strength of...
Pipelines for Flexible Deliveries
The use of pipelines facilitates flexible deliveries for projects and flexible distribution on the farm. Pipelines have the advantage relative to canals in that they do not have to follow...
Pipeline Types and Design Considerations
Pipelines are extensively used to upgrade irrigation delivery facilities. The advantages of a pipeline system include an improvement in water conservation and the ability to extend water...
Design of Semi-Closed Pipeline Systems
Semi-closed pipeline systems controlled by downstream activated float valves permit low pressure pipeline systems to communicate information from the outflow location back to the source...
Case Study?Closed Pipeline Systems
The paper discusses closed pipeline system and its automation, including variable pumping rates, sensing devices, automatic controls, pressure regulators, flow measuring devices, surge...
Case Studies?Semi-Closed Pipeline Systems
The paper discusses the title subject in terms of automated systems, flexible scheduling, and system components. Project locations include the Mahaweli Development Project, Sri Lanka;...
Case Study?Open Pipeline System, Coachella Valley Water District
A supervisory canal control system installation was started in 1966, seventeen years after start up, and a major upgrading was completed in 1983. The canal delivery system now has a central...
Yakima-Tieton Irrigation District Rehabilitation Program
The Yakima-Tieton Irrigation District obtained funding from the U. S. Bureau of Reclamation and the State of Washington to replace an open canal and lateral irrigation delivery system...
Hydraulic Design Limitations for Gravity Flexible (Non-Rigid) Plastic Pipes Flowing with a Free Water Surface
Hydraulic design limitations are necessary for gravity plastic pipes when designed for use as a sanitary sewer, flowing part full with a free water surface. The limitation for pipes designed...
Minimum Energy Loss and Velocity Profiles in Pipes
Minimum energy loss in a flow is discussed. The concept is applied to derive velocity distributions for laminar flow through a circular pipe and steady uniform turbulent flow through a...
Joint Consideration of Pipe Breakage and Pipe Flow Probabilities
Two issues of distribution network reliability, namely, probability of pipe failure and probability of the design flow being exceeded have been discussed. Expressions containing measures...
Water Distribution System Design by Chance-Constrained Model
The objective of this paper is to present an optimization model for the design of water distribution systems considering the uncertainty in required demands, required pressures, and pipe...
Model for the Optimal Rehabilitation and Replacement of Water Distribution System Components
The objective of the model presented is to determine the minimum cost solution, given the nonlinear nature of the equations required to describe the cost and the hydraulics of a water...
Embankment Overtopping?Case Histories
Because many existing dams are subject to overtopping, there is a need to understand embankment behavior during an overtopping event. Understanding of this behavior will allow evaluation...
Pipe Network Analysis on a Microcomputer
This paper reports on experience gained with the use of commercially available software for pipe network analysis. This information may be helpful to water system managers and consulting...
Input Programs for Engineering Applications
This paper discusses several input program types and the data structures associated with them. Two input programs were designed for KYPIPEF to demonstrate the use of files of records and...
Subsurface Drainage System for the Klamath Project
The U. S. Bureau of Reclamation's Klamath Project was authorized in 1905 for irrigation purposes. A subsurface drainage system was constructed in the public lands within the...
Practical Analysis of Flexibly-Connected Building Frames
Modeling of flexible connection behavior as elastic-perfectly plastic is proposed for analysis of building frames, and results based on this idealization are compared with fully non-linear...
Return to search