Multisite Hydrocomplex Optimization
A multisite complex is analysed in northern Quebec to decide the level of equipment needed that will supply firm energy at the best possible unitary price. Four possible sites were chosen...

Hydropower Development of China's Yangtze River
The Yangtze has eight times the hydro potential of the Columbia River basin, currently the largest developed hydro system in the world. In order to pursue economic development through...

Computer-Aided Operation of a Hydropower System
This paper outlines the development of a computer model which optimizes the operation of a regulated river system given certain constraints using an adaptive deterministic linear programming...

A Case Study of Hydropower Operation Based on Runoff Forecast
The intent of this paper is to outline a forecast approach developed to enable the operation of power storage projects, and to illustrate from employing the approach that overall system...

Hydrologic Dispatch Model for a Hydropower System
A hydrologic dispatch model was developed for an 11 plant, six reservoir hydroelectric system. The model incorporates load forecasting, system dispatching strategy, and database management...

DURAPLOT: A Flexible Approach to Hydropower Site Optimization
The U. S. Army Corps of Engineers, North Pacific Division Office has over the past six years performed reconnaissance and feasibility level hydropower studies at a variety of sites throughout...

The Use of Time Series Analysis to Estimate Flow Duration Curves to Assess Energy Potential for Low Head Hydro Redevelopment
The proposed hydroelectric site location has a low head potential making discharge the primary energy production component. A flow duration curve (FDC) study was commenced to generate...

Using Fall Streamflows as Predictors of Spring Runoff at the Dalles, Oregon
The Northwest hydropower system is characterized by a drawdown season when normally full reservoirs are drafted to meet firm obligated loads, and a refill season in which the reservoirs...

Murray Hydro Project?Structural Design
This paper will summarize design criteria, parameters, methods of analysis, and other relevant data that were used in the design process of the structural features of the Murray powerhouse...

Early Detection of Rotor Cracks?Monitoring & Methodology
This paper describes a diagnostic method for the early detection of shaft cracks on rotating machines. The method is based on interpretation of the lateral synchronous (1x) and twice per...

Variable Speed Generators in Hydro Applications
This paper discusses the investigation of the doubly-fed variable speed machine as a potential candidate to convert a varying input speed to a constant frequency, constant voltage output....

Characteristics of the Roesel Machine Used for Small Scale Hydro/Wind or Sea Wave Electric Power Generation and Storage
An electrical machine with property of synchronous as well as asynchronous characteristics and based on ceramic magnet programming technology by continuous printing of the desired number...

TBM Tunnel Friction Values for the Kerckhoff 2 Project
In the mid-1970's Pacific Gas and Electric Company began design of the Kerckhoff 2 Hydroelectric Project, which supplements the Kerckhoff 1 project built in 1919. The Kerckhoff...

Free-Rotor, River-Velocity Turbine
This paper discusses the development of a very simple and inexpensive underwater turbine which will extract power ranging from a fraction of a HP up to 20 HP from the velocity of the running...

Upstream Elbow Tubular Turbines for Low Head Applications
This paper presents standardized Neyrpic tubular turbines for Pontook and ByPass Hydroelectric Projects. Upstream elbow turbines have been selected for those sites. In this paper, the...

Optimisation of Bulb and Kaplan Turbine Runners
The paper presents a brief survey of the theoretical method used so far at Turboinstitut Ljubljana for axial runner design and analysis. Theoretically optimised runner is later experimentally...

Bureau of Reclamation Uprating Program
The Bureau of Reclamation is an agency of the Department of the Interior and was established in 1902 to oversee the development and conservation of the Nation's water resources...

The Cougar Project?Turbine Runner Replacement
The Cougar turbine runners have been subjected to a substantial amount of cavitation damage which has required repair by welding. The continued welding repair has subsequently resulted...

Independent Turbine Testing and Research
The St. Anthony Falls Hydraulic Laboratory (SAFHL) is presently upgrading their Turbine Test Facility. Completion of the upgrade, including checkout tests, is scheduled for Fall 1987....

Hydro Machinery Problem Solving Experiences
Within the last decade the use of modern data acquisition instrumentation and techniques have moved the subject of the machinery problem solving into a more scientific arena. This paper...

 

 

 

 