Closing the Loop
The 5.1 mi Cooper River Bridge, the longest in South Carolina, completes the I 526 Mark Clark Expressway around Charleston. It is a two-way, four-lane structure with the capability of...

Scour Analysis at Highway Structures
ASCE Manual 54 entitled, `Sedimentation Engineering' is being revised. In the revision, a chapter on `Scour at Highway Bridges' will be included. This paper will describe in general terms...

Quality Control and Quality Assurance Plan for Bridge Channel-Stability Assessments in Massachusetts
A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by...

Screening of Bridges in New Jersey for Scour
New Jersey Department of Transportation has embarked on a program to evaluate all existing bridges over waterways to assess their vulnerability to failure by scour. The Stage I (Screening...

Quality Control in Evaluating Scour at Bridges
Quality control procedures currently in use for conducting statewide bridge scour screening and evaluation studies are described. The procedures address bridge scour screening and calculation...

New Jersey Bridge Scour Evaluation Program
The New Jersey Department of Transportation has undertaken an ambitious scour evaluation program for the existing waterway bridges in the state. The methodology developed and utilized...

Bridge Scour Analysis in New Jersey: Which Scour Factors Matter Most?
This paper seeks to correlate the scour susceptibility of bridges with such observable characteristics as bridge design features, waterway characteristics, and geographic and geologic...

In-Depth Scour Evaluations for Bridges in Pennsylvania
The scour evaluations described herein have been prepared for the Pennsylvania Turnpike bridge crossing the Unami Creek, the first bridge studied in a series of nineteen major Turnpike...

Comparison of Two Methods of Screening Bridges for Scour
Scour evaluations were performed for large numbers of bridges in two separate studies in New York and New Jersey. The two studies used different screening methods for identifying high-priority...

Case Studies of Bridge Scour in Western New York
As part of the New York State Thruway Authority's bridge hydrologic/hydraulic evaluation program, 63 structures over 42 stream crossings in western New York were assessed for scour potential...

Scour Analysis for Bridges over Missouri and Mississippi Rivers
Engineering services are being provided for three bridge crossings, two over the Missouri River and the other over the Mississippi River. Scour consideration for the bridged waterways...

Risk Analysis of River Bridge Failure
The proposed procedure to determine the risk of river bridge failure is based on observations and analysis of river bridge failure data of more than 300 U.S. bridges, 180 South African...

Stream Stability and Scour Training in Support of the NBIS
The Federal Highway Administration is now requiring a comprehensive evaluation of bridge scour as part of the National Bridge Inspection Standards (NBIS). To support the implementation...

Implementation of the NBIS Scour Evaluation Program?District 2, Florida
The Federal Highway Administration is now requiring a comprehensive evaluation of bridge scour as part of the National Bridge Inspection Standards (NBIS). District 2, Florida Department...

Flow and Scour Near an Abutment
Laboratory experiments were used in conjunction with a two-dimensional depth-averaged numerical flow model, RBFVM-2D, to investigate the relationship between flow velocity distribution...

The Fallacy of Local Abutment Scour Equations
Existing laboratory model studies for quantifying local abutment scour deviate significantly from conditions typically found in the field. This has resulted in predictive local abutment...

Scour Prediction Model at Bridge Abutments
A model to predict local abutment scour is presented. The model is based on a large number of laboratory experiments over the past half century. The dependent variable, a ratio that includes...

Bridge Abutment Scour in a Floodplain
Recent bridge failures due to pier and abutment scour have reinforced the need for better methods of scour prediction. This paper addresses the problem of prediction of clear-water scour...

Bridge Abutment Scour in Compound Channels
Experiments are reported which quantify the effect of channel geometry on local scour at abutments for bridges crossing compound river channels. The channel geometry effects are represented...

Plans for a Sensitivity Analysis of Bridge-Scour Computations
Plans for an analysis of the sensitivity of Level 2 bridge-scour computations are described. Cross-section data from 15 bridge sites in Texas are modified to reflect four levels of field...

 

 

 

 

Return to search