Planning and Operation of Hydropower Development on a Navigation System, a Case Study
This paper examines the steps taken to optimally develop the hydropower plant at Lock and Dam No. 13 on the Arkansas River as part of an existing multiple use system. The specific items...

Harnessing the Allegheny: Four Low-Head Projects
The navigable portion of the river, extending northeast of Pittsburgh approximately sixty miles, contains eight lock and dam systems under the jurisdiction of the U.S. Army Corps of Engineers...

Siphon Penstock Installations at Hydroelectric Projects: A Survey of Design, Construction and Operating Experience
There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock...

Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...

Pumping System Permits Diversion of Water River Dam
For project construction at an existing Corps of Engineers' dam in New Mexico, where modifications to the existing outlet works were performed, a barge-mounted pumping system...

Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
This paper describes a joint venture between the United States Bureau of Reclamation and the State of Wyoming to increase the storage capacity and power generation capacity of Buffalo...

Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...

Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...

Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...

Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
At Tarbela Dam in northern Pakistan, the Third Extension Project, units 11 to 14 of 440 MW each, is presently under construction. When completed in 1992, the multipurpose hydro-irrigation...

Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....

Hydro on Hold
Hydropower projects have become the target of a growing environmental movement overseas. The tradeoff between clean, renewable energy and the possible environmental impacts of the reservoirs...

Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...

High-Strength Concrete: Weighing the Benefits
Russell, Gebler and Whiting describe the properties of high-strength concretes, the current state of knowledge on freeze/thaw effects, and procedures for batching, mixing, transporting,...

Rx for Dam Repair
Bernard asserts the growing importance of maintenance to extend the service life of dams as more and more of them reach or exceed their design lives. He describes renovations to Easton...

Roller Compacted Concrete II
This volume includes the papers presented at the 1988 ASCE Specialty Conference on Roller Compacted Concrete. Included in the proceedings are experiences of roller compacted concrete dam...

Microcad: Pushing the Limits
Several engineering projects are covered which illustrate the increasingly complex design applications being accomplished with microcomputer based software. A dam, an apartment complex,...

Considerations for Retrofitting Large Dams for Hydropower
The majority of large dams which are currently being retrofitted for hydropower are either flood-control impoundments or navigation structures. In the Ohio River Division of the U. S....

Hydropower retrofit at the Toledo Bend Dam
Since the early 1970's, the Authorities have been examining the possibility of utilizing sluiceway releases to generate hydroelectric power to meet most of the demands of...

Independent Consultant's Inspection Reports F.E.R.C. Order No. 122?The First Five Years
On January 21, 1981, the Federal Energy Regulatory Commission (FERC) issued Order No. 122, revising and expanding the periodic inspection program established in 1965 by the Federal Power...

 

 

 

 