Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Annual energy calculations are frequently used to optimize design parameters at a turbine site and to compare energy production based on equipment offers from various suppliers. In this...
Simulations of Multireservoir System Operation
Simulation modeling has evolved from a direct examination of operating policies into operational decision support systems, integrated multiple use expansion planning systems and special...
How Many Years to Fill with Sediment, a Sediment Study of Lake Powell on the Colorado River
A study to determine the current capacity and to update information on the life expectancy of Lake Powell was conducted by the Bureau of Reclamation. The study documented the present storage-elevation...
Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...
Design and Construction of the Moose River Hydroelectric Project
The project's main features are: a 7 ft high, 240 ft long cast-in-place concrete overflow weir; bell mouth entrance concrete intake structure with trashrack and trashrake;...
China's Ertan Hydroelectric Project
Ertan will be a major hydroelectric project on the Yalong River in China. The project consists of a 240 m high arch dam, two tunnel spillways, an overflow spillway, mid- and low-level...
Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...
J. C. Boyle Hydroelectric Project Spillway Model Study
The J.C. Boyle Hydroelectric Project is an 80 MW facility near Klamath Falls, Oregon. The project consists of a concrete canal, tunnel, parallel penstocks and two Francis turbines. Upstream...
Spillway Crest Development through Model Testing on Chenderoh Ambursen Dam
The Chenderoh Hydroelectric Project on the Perak River in Malaysia was placed in service in 1930. The hollow Ambursen dam was modified in 1944 by the additions of a concrete cap with flashboards....
Licensing the Moose River Hydroelectric Project
This paper describes environmental considerations in the licensing and permitting of the Moose River Hydroelectric Project, a 12.2 MW development in Central New York State. It illustrates...
Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...
Negotiating with State and Federal Fish and Wildlife Agencies
The Federal Power Act of 1920 (Act), as amended by the Electric Consumers Protection Act of 1986, requires that the Federal Energy Regulatory Commission, in order to adequately and equitably...
Overview of EPRI's Hydro Program
The near term objective of the Electric Power Research Institutes (EPRI) Hydro Program is to provide practical and easily used research results and industry guides in the areas of dam...
Fishery Assessments at Hydroelectric Projects Using Electrofishing, Nets, and Hydroacoustics
Assessments of fish population and entrainment were made at a hydroelectric generating station and spill dam on the Ohio River. By combining complementary sampling techniques, full assessments...
Managing the Columbia River to Meet Anadromous Fish Requirements
According to northwest fishery agencies and Indian tribes the protection for juvenile salmon and steelhead is not adequate. The Northwest Power Planning Council, formed as the result of...
Radio Telemetry as a Tool for Fisheries Mitigation
Monitoring discrete fixed locations requires automated receivers and data loggers while manned, mobile receivers are more suited to general movement or habitat studies. Of the three tagging...
Hydropower and Fish Passage Impacts
The Pacific Northwest Electric Power Planning and Conservation Act (Act) of 1980 formed the Northwest Power Planning Council, which establishes criteria and sets goals for developing future...
Tailwater Management for Beneficial Uses
Tailwaters can provide significant benefits for recreation, fisheries, assimilative capacity for treated wastewaters, and water supply for municipalities and industries. Development and...
Regional Rivers Resource Assessment as a Tool for Hydropower Planning and Policy: The Pacific Northwest Rivers Study
In August, 1984, the Bonneville Power Administration (BPA) and the Northwest Power Planning Council (Council) initiated a study to provide information about important river characteristics...
Using IFIM at the Upper Greenwich Project and Other Hydropower Developments
The Instream Flow Incremental Methodology (IFIM) is widely used at numerous hydroelectric projects today for determining flow releases. IFIM is capable of quantifying changes in aquatic...
Return to search