Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...

Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...

Summer Falls High Head Kaplan Turbine Project
The Summer Falls Project is located on the Main Canal of the Grand Coulee Irrigation Project approximately eight miles south of Coulee City in Grant County, Washington. The power development...

Pyrites Hydroelectric Project, Canton, New York
This paper describes the Pyrites Hydroelectric Project in Canton, New York, an 8-MW project completed in December 1985. The key to its successful development was a team approach that included...

After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...

The European Underground
Three tunneling projects in Europe are described: a tunnel bored under two rivers in Lyon, France, a subway station constructed as a mined tunnel in Vienna, Austria and a tunnel mined...

Landmarks in Civil Engineering
Historic American engineering projects sampled in this article represent those documented in Landmarks in Civil Engineering, by Daniel L. Schodek,...

Sewage Plant Engineered for Value
The Camden County (NJ) Municipal Utilities Authority was formed in 1972 to cope with suburban growth that had overloaded 34 primary treatment plants. By the early 1990s, the Authority...

A Station With a View
The Port Authority TransHudson Corp. (PATH) is renovating and expanding Exchange Place station, the first stop in New Jersey across the Hudson River from lower Manhattan. To be completed...

Building Bridges Faster
Guidelines are presented that tell how to write a contract that will lead to radical reductions in the time to build or rebuild a bridge. The article covers how to write an incentive/disincentive...

Behavior of Completed RCC Dams
Enough roller compacted concrete dams have been completed to allow an overall evaluation of this new approach to construction. Performance has been good. No operational restrictions have...

Design and Construction of Lower Chase Creek Dam
Lower Chase Creek Dam is a roller compacted concrete flood control dam located in a generally dry creek in eastern Arizona. Dam design, including the site investigation and start-up of...

RCC Pavements in Tasmania, Australia
Over 60,000 m**2 of high strength Roller Compacted Concrete (RCC) pavement has been completed in Tasmania, Australia, since December 1986. Projects have ranged from footpaths and small...

Roller Compacted Concrete with Marginal Aggregates
Roller compacted concrete is a technology which is vastly expanding beyond the traditional uses of pavement and dam oriented projects. Hornsby Bend Wastewater Treatment Plant required...

Treatment of Karst Along Tennessee Highways
The construction and maintenance of highways in karst areas of East Tennessee has resulted in the occurrence and treatment of induced sinkholes along the ditchlines of numerous highways....

Residential Damage in an Area of Underground Coal Mining
In order to estimate the potential for future subsidence-related residential damage, a statistical analysis of past residential damage in the Boulder-Weld, Colorado, coal field was performed....

Subsidence Abatement Projects in Wyoming?An Overview
Abatement projects were undertaken to prevent or minimize further subsidence in Wyoming communities. The paper gives a brief historical background on the mining activity in Wyoming. Subsidence...

Advanced Reconstruction for Subsidence-Damaged Homes
To address many of the residential damage-reconstruction problems from mine subsidence a research and development project was undertaken in Illinois. Phase I of this project is complete...

Highway Factors in Truck Wrecks
An examination is presented of highway factors as they interact with driver and vehicle factors in large truck accident causation. Examples of highway defects are discussed along with...

Design Considerations for Trucks in Work Zones
In an Eastern state a 3. 8 mi (6. 2 km) work zone had 14 accidents during a project duration of 120 days. Eleven of the 14 accidents occurred at temporary crossovers where traffic was...

 

 

 

 