The Council's Strategy for Improving Fish Passage
The Columbia River Basin Fish and Wildlife Program was developed by the Northwest Power Planning Council in 1982 and amended in 1984 and 1987. The program is likely the largest ongoing...

Water Management for Juvenile Fish Passage
The regional goal of restoring upriver runs of adult salmon and steelhead requires increased survival of the juvenile fish migrating to the ocean. Juvenile fish survival requires: (1)...

A Juvenile Fish Bypass Program at Columbia River Basin Projects
Hydroelectric development in the Pacific Northwest region has altered the natural flow of the Columbia River and its major tributary, the Snake River. This has proven to be detrimental...

Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...

Power System Study to Determine Hydro Benefits
This paper discusses evaluation methodologies used by Stone & Webster to determine the power benefits for six potential hydropower projects at existing U. S. Army Corps of Engineers...

Determination of Values of Project Storage for Hydropower Scheduling
The Columbia River is characterized by multiple and sometimes conflicting uses, and its basin extends over many political jurisdictions. To balance pluralistic needs and authorities with...

Managing for Multiple Uses?Theory and Practice
One of the gratest challenges given to reservoir operators is to provide an operating regime that will accomplish the objectives for which the project was constructed. This is important...

Columbia River Treaty Perspectives
The Columbia River Treaty was signed in 1961 and ratified by the governments of Canada and the United States in 1964. The Treaty required British Columbia to construct three large storage...

Hydropower Development of China's Yangtze River
The Yangtze has eight times the hydro potential of the Columbia River basin, currently the largest developed hydro system in the world. In order to pursue economic development through...

Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...

DURAPLOT: A Flexible Approach to Hydropower Site Optimization
The U. S. Army Corps of Engineers, North Pacific Division Office has over the past six years performed reconnaissance and feasibility level hydropower studies at a variety of sites throughout...

The Effect of Sedimentation on Hydro-Developments
This paper will discuss two major impacts which are the hydro construction on natural stream sedimentation and the sedimentation related problems during hydro operation. The two types...

Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...

Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...

Innovative Intake Protects Both Aquatic Life and Turbine Equipment
The successful operation of small hydro projects requires an intake system with the ability to screen fish and debris from the water taken into the turbine. This separation may be required...

30 More Megawatts at the Don Pedro Project, Calif.
A unique and cost effective concept for installing an additional hydroelectric generating unit to an existing project in a very confined location is presented. The concept also allows...

Managing the Jim Falls Hydro Redevelopment Project
This paper addresses two of the water management issues involved in the design and construction of the Jim Falls Hydro Redevelopment Project. These issues include selecting the optimum...

Rebuild of Ten Mile Intake Flume Structure for Electron Hydropower Project
In 1984 the Puget Sound Power and Light Company began a rebuild of what is popularly referred to as the 'world's crookedest railroad. ' The 'railroad'...

New Martinsville Hydroelectric Project
The 34MW New Martinsville Hydroelectric Project is presently under construction in West Virginia. Located at Hannibal Locks and Dam near river mile 126 downstream from Pittsburgh, PA,...

Large Capacity Rock Anchors Stabilize Bagnell Dam
Evaluations of spillway discharge capacity and stability of structures for the Osage Hydroelectric Project indicated that the Project was unsafe during the occurrence of the Probable Maximum...

 

 

 

 

Return to search