Developing Performance Concrete and Its Acceptance by Code Authorities
Projects incorporating the benefits of Performance Oriented Concrete frequently occur within the established jurisdictions of specific building departments, highway departments, or other...

A Better Way
Shanley recommends providing for a dispute review board in contract documents as a way of avoiding long and costly litigation or arbitration as a result of disputes. A dispute review board...

Energy from the Amazon
Cadman describes Brazil's plans for exploiting the vast hydroelectrical potential of the Amazon Basin, placing them within the context of the country's growing...

Specifications for Masonry Structures
Specifications for Masonry Structure (AC1530.1-88/ASCE6-88) is a joint effort of the American Concrete Institute and the American Society of...

Sons of Martha
Civil Engineering Readings in Modern Literature
Sons of Martha:Civil Engineering Readings in Modern Literature explores the history and heritage, the people, the projects and the ethics involved...

Expert Systems for Civil Engineers
Education
While the technology of expert systems can provide engineers with another approach to the development of computable models for civil engineering problems, it is not clear what a course...

Microcad: Pushing the Limits
Several engineering projects are covered which illustrate the increasingly complex design applications being accomplished with microcomputer based software. A dam, an apartment complex,...

The Pacific Northwest Rivers Study: Development of a Rivers Inventory and Analysis System
To minimize conflicts between hydropower development and resource conservation, the Bonneville Power Administration and the Northwest Power Planning Council initiated the Pacific Northwest...

Hydropower Development of the Hongshuihe, China
Power is the predominant factor in the development of the Hongshuihe River. The Province of Guangdong is the most highly developed area in the Pearl River Basin, where the fast growing...

Small Hydro Studies in Northern Thailand
As part of the Thai Government's programme of rural electrification, Balfour Beatty Engineering (BBE) has been assisting the Provincial Electricity Authority (PEA) in the...

Pumped-Storage Project Site Selection
The paper presents a case history in the selection of a site for a large pumped-storage project for Oglethorpe Power Corporation. The case history illustrates how a large number of potential...

New Opportunities for Pumped Storage Projects
A variety of design, economic, power supply, and environmental factors are combining which will bring a resurgence to the interest in developing pumped storage projects in the early 1990's...

Refurbishment and Modernization of Hydro Plants
In order to assemble experiences, settle and systematize the problems connected with rehabilitating and redeveloping hydro power plants and to work out proposals a project titled 'Refurbishment...

Selection of Jim Falls Turbine Generators
The selection of the unit configuration for the Northern States Power Company's Jim Falls Hydro Redevelopment Project was based on an extensive evaluation of various turbine...

Optimizing Hydropower Potential Using Water Management Techniques
The development of hydropower facilities at existing dams creates an interesting dilemma to both public and private hydro developers: Is the proposed development the best-adapted use of...

Probabilistic Capacity Value of Nonfirm Hydro Energy
Electric utilities with a predominant mix of hydro generation traditionally apply Energy Planning criteria rather than Capacity Planning criteria in developing their generation resources...

Equipment Selection and Site Optimization Based on Energy Considerations
Most new hydro plants contribute little or nothing to overall system capacity. Therefore, traditional evaluation techniques based on dollars per installed kilowatt have no relevance when...

Vilavilani Hydroelectric Project
There is an urgent need to solve the water and energy shortages in the Department of Tacna, on the coast of Southern Peru. The Vilavilani Hydroelectric Project could solve some of the...

Actual Vs. Expected Performance of Small Hydro Projects
This paper presents the results of several case studies of small hydro projects that compare the expected performance with the actual performance as measured in terms of energy generation....

Movable Dam?Gate Selection Procedure
Very few new dams are now being considered, particularly for waterpower and even more specifically for low head waterpower in the lower reaches of major rivers. The City of Harrisburg,...

 

 

 

 

Return to search