Graphical Resource-Based Object-Oriented Simulation for Construction Process Planning
Simulation is a powerful tool for construction process design and optimization. The results of a simulation provide detailed process information, such as resource utilization and idleness,...

Artificial Neural Networks and Knowledge-Based Systems: Complementary AI Techniques for Civil Engineering
This paper considers the feasibility of integrating Artificial Neural Networks (ANNs) and Knowledge-Based Systems (KBSs) to solve civil engineering problems. KBSs are superior at representing...

A Numerical Procedure to Compute Bearing Capacity of Shallow Foundations
A simple numerical procedure of calculation of bearing capacity of shallow foundation is proposed. This procedure employs the Terzaghi-Prandtl model of general shear failure. In this paper,...

Development of Differential Growth Method for Automated Vehicle Recognition
The purpose of this study is to improve a system which enables automatic recognition of vehicles from video images using image processing system. Basic methodology is a subtracting operation...

Classifying Constructability Information
Integration of constructability information in the early stages of a project is known to provide significant savings opportunities for cost and schedule. One critical part of such a program...

The Use of Numerical Rule Processors in Engineering Calculations
A Numerical Rule Processor uses a declarative approach to the processing of engineering calculations. The rules which link the parameters are set out in a separate rule base and the order...

Optimal Processor Mapping for Massively Parallel Finite Element Computations
The exploitation of massively parallel computer for finite element analysis requires efficient usage of processors as well fast speed. For example, the efficiency of a parallel matrix...

Parallel-Adaptive Finite Element Analysis on a Transputer Cluster
This paper describes a parallel-adaptive finite element approach on a parallel transputer cluster of the MIMD type. The analysis is controlled by a special error indicator. In comparison...

Secondary Member Contribution to the Behavior of Damaged Multigirder Highway Bridges
This paper examines the effects of secondary members (cross bracing and diaphragms) on the prediction of the response of damaged simple span steel multigirder bridges. Extensive analytical...

Containing Construction Change with Computers
This paper discusses the benefits of managing construction change orders with computers over manual methods. Construction contracts formulate change procedures that are often at odds with...

Using Product Models to Plan Construction
The conceptual design of the CasePlan case-based planning and scheduling system is presented. Case-based reasoning is a promising technique for capturing the expertise of contractors who...

The Application of Gauss Numerical Integration Method in Arch Dam Trial-load Method Program
The characteristics of Gauss Numerical Integration Method are the unequal distance between nodes and fairly high accuracy. When the number of nodes is n, the algebraic accuracy can be...

The Denver Airport: Managing a Megaproject
If the 53 sq mi, $2.7 billion Denver International Airport seems daunting in size, imagine trying to manage its construction. Supported by over 100 firms, the five year-long project is...

Nondestructive Evaluation Techniques and Their Role in Infrastructure Management
Nondestructive evaluation (NDE) techniques can play an important role in infrastructure management. They can be used to assess current condition a well as to predict future performance...

Sonic NDT for Infrastructure Assessment
Sonic Nondestructive Testing (NDT) techniques are valuable tools for assessing infrastructure. Relatively recent innovations in the field can reveal the internal conditions of concrete...

Benefits From Improved Management of Pavement Facilities
Effective management of pavement facilities can provide several benefits both the agency and the travelling public over the long term. The benefits achieved from improved rehabilitation...

How to Get Local Public Works Agencies to Use Structured Infrastructure Management Approaches
As more agencies consider adopting infrastructure management systems, the lessons learned in developing and supporting the use of current systems should be used to structure the support...

A Graphics-Based System for Urban Roadway Management
This paper describes a graphics-based system for urban roadway management. The main objective of the system is to select the cost effective maintenance and rehabilitation (M&R)...

The TM? Railroad Track Management System
The TM$ Railroad Track Management System is designed to increase effective access to track performance data, to forecast the effects of deterioration and maintenance activity, and to formulate...

Effective Use of Statistical Analysis for Data Collection and Model Development
Infrastructure managers require enormous amount of data for their planning, design, and construction operations. Often the emphasis on quality of data collection, analysis, and interpretation...

 

 

 

 

Return to search