Practical Aspects of Repairing and Rewinding Hydro-Electric Generators
Often the general condition of the winding can be assessed and in some cases, corrective action can be taken to prolong the life of the winding. In other situations, the assessment may...
Rehabilitation of Victoria Dam
Rehabilitation of a 54-year old thin concrete arch-buttress dam was completed without interruption of power generation using pressure injection of an epoxy adhesive. This paper presents...
Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...
Hydro System Enhancement: TVA's Comprehensive Hydropower Program
The Tennessee Valley Authority's Comprehensive Hydropower Program is systematically identifying opportunities for increasing hydroelectric generation in five areas: small...
Alyeska Reroutes Trans-Alaska Pipeline at MP 200
This paper discusses the 1985 wintertime repair/reroute to the Trans Alaska Pipeline System (TAPS). The rerouted pipe was approximately 4000 feet long and cost approximately 27 million....
Repair Welding of Arctic Offshore Structures and Vessels
This paper describes the welding procedure development for repair or field modifications of offshore drilling structures and vessels made with several different steel grades produced for...
Glen Canyon Dam's Quick Fix
When the spiullways at Glen Canyon Dam were severely damaged from unexpected flooding in 1983, the Bureau of Reclamation had just 10 months to repair the tunnel spillway lining and build...
Back on a Full Speed Track
A $30 million rehabilitation project is transforming a Massachusetts rail line that shows its age and poor maintenance history. Rehabilitating the line from Bristol County, Mass. to Hyannis...
Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...
Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...
Innovative Repairs to Steel Sheet Pile Structures
Several unique and many unusual repair techniques have been used to structurally rebuild steel sheet pile walls. An example of a unique repair to a cellular cofferdam utilizing a suspended...
Report of Task Committee on Drydock Design Criteria
This paper briefly summarizes the work carried out by a Task Committee on Drydock Design Criteria which was established by the Committee on Ports and Harbors. The Committee was established...
Louisiana Avenue Wharf E: Rehabilitate the Existing Wharf into a Container Terminal
The Port of New Orleans is currently modernizing the existing facilities in order to handle the containerized cargos, therefore enabling it to compete with other ports located on the Gulf...
Rehabilitation of Wharf No. 8?Port of Houston
A routine inspection of wharves at the Turning Basin Terminal, uncovered evidence of extensive damage, including evidence that the 30-inch diameter steel pipe piles supporting Wharf No....
Rehabilitation of Gravity Wharf by Underpinning
The Municipal Wharf at the Port of Providence, Rhode Island, is currently under rehabilitation to accommodate modern trends in marine cargo handling and shipping. The three-phased project...
Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...
Bridge Management: Computer Aided Priorities
Pennsylvania's Department of Transportation has invested $3.6 million in developing the concept and software for a Bridge Management System that will help determine the needs...
Rehabilitation of Blackfoot Dam In-Situ Testing and Analysis
The dam was constructed in 1909 and was recently found to require rehabilitation to enlarge the spillway and improve embankment stability against the large earthquake potential in the...
New Approaches to Rehabbing Old Dams
The U.S. Bureau of Reclamation takes a look at several new ways of building old dams for maximum flooding. A labyrinth spillway was built at Ute Dam near Logan, N.M. to increase reservoir...
Diamond Fork Hydroelectric Power Development
The Strawberry Valley Project was conceived in the early 1890s as an irrigation project to supply a maximum of 635 cfs of water from the Strawberry Reservoir through a 3. 8-mile-long tunnel...