Uplift Pressure below Gravity Dams on Rock
The magnitude of the uplift force at the base of a concrete gravity dam founded on rock is strongly dependent on the properties of the discontinuities within the rock mass. This paper...

Flow Characteristics in an Irregular Spillway Model
A physical model of the spillway for a proposed water supply reservoir near Meridian, Texas, was constructed to determine the optimum spillway design which would maintain an acceptable...

Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...

Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...

Optimization of Power Production Based on Efficiency Data
Computer programs dealing with different parts of the optimization process are in operation in Norway today, and they include: the hydrological part from weather forecast to reservoir...

Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...

Oil Hydraulic Design for Turbine Control
The paper addresses three areas of Oil Hydraulic Design for Francis and Kaplan Turbines: smart accumulator condition sensors, high flow servo logic, and high pressures Wicket Gate cylinder...

Hydro Turbine Submergence
The elevation of a hydro-electric turbine above or below tailwater is based on hydraulic model studies to determine the critical sigma, defined as the ratio of barometric pressure plus...

Upgrading Open-Wheel Pit Hydro Plants with Modern Submersible Hydroturbines
This paper presents a new approach in rehabilitating open-wheel hydrosites by using modern, standard submersible hydroturbines, open flume type cylinder gates, and high efficiency draft...

Turbine Efficiency Measurements by the Pressure-Time and the Current-Meter Method at Paugan
Paugan generating station was built in the 1920s. Although the generators were converted from 25 Hz to 60 Hz in the mid 1950s, the original runners were in place until recently when a...

Transient Analysis of the Finchaa Hydroelectric Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...

Fluctuating Pressure Measurements on a Large Hydro Turbine
The New York Power Authority is investigating the feasibility of upgrading the thirteen 150,000 kW turbines-generators at the Robert Moses Niagara Power Station to improve efficiency and...

Predicted and Observed Axial Behavior of Piles
Results of a Pile Prediction Symposium
This publication presents the results of a pile capacity event that was held at the Lakefill site on the Evanston Campus of Northwestern University in conjunction with the 1989 Foundation...

Beam-Supported Slabs Subject to Edge Loading
A model is presented which allows a designer to estimate stiffnesses required to provide a given critical buckling load in beam-supported slabs subjected to biaxial edge loading, such...

The Simulation of Variable Release Temperatures from the Rock Creek-Cresta Project Using the USFWS Instream Temperature Model
Pacific Gas and Electric Company (PGandE) operates the Rock Creek-Cresta Project on the North Fork Feather River (NFFR) for hydroelectric generation under authority of Federal Energy Regulatory...

Computerized Operation Models of Oroville Reservoir
Two monthly computer operational models, OROTHM1 and OROTHM2, were developed to provide more detailed operation and maintenance studies for the Oroville facilities. Currently another computer...

High Pressure Grouting of the Bath County Tunnel System
A major grouting program was completed at the Bath County Pumped Storage Project between March and September 1985. High pressure grouting for seepage reduction was completed in a total...

The Impact of Inlet Flow Characteristics on Low Head Hydro Projects
This paper discusses the intake civil designs, addressing head loss and flow distribution into the turbine intake. The impact of poor flow quality on head losses, turbine performance,...

Tracer Dilution Flow Measurement Application to Short Penstock Length
Absolute performance evaluation of hydro-turbines requires the determination of flowrates. Flow measurement is probably the most difficult aspect of determining a unit's efficiency....

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

 

 

 

 