Development of a Resident Engineer
The author discusses a development program suitable for a Resident Engineer to take up. Included in the requirements of the program are actual experiences, training courses and personal...

Cost Engineering for Disputed Work
Engineers and architects tend to underestimate the cost of disputed work, especially those connected with delay. The engineer, using industry standards and estimating rules of thumb, can...

Changing Priorities in UK Construction Research
This paper addresses two types of situations to contend with in building assessment: aging structures all built at about the same time and to standards no longer acceptable, and newer...

Earthquake Experience Data on Power and Industrial Structures: Applications to Seismic Design and Evaluation
An extensive study was conducted to document the seismic performance of typical power plant and industrial structures in selected recent strong earthquakes and to correlate the performance...

Micro/Mini/Maxi?Hardware or Software, Or, What's the Future??What's the Answer?
Current research is developing new materials, producing more sophisticated circuits, allowing price reductions, linking micros and minis to mainframes. The next technological avalanche...

The Transit Industry Microcomputer Exchange Support Center
The Transit Industry Microcomputer Exchange Support Center has been in existence for nearly three years. This paper describes the reasons for establishing the center, its current activities,...

Fracture Problems in the Transportation Industry
Six cases of damage tolerance assessment are presented, involving structures or vehicles in the U.S. transportation industry. Damage tolerance means arranging design, maintenance, and...

Seismic Experience Data?Nuclear and Other Plants
The Seismic Qualification Utilities Group (SQUG) was formed to explore the use of earthquake experience data of equipment performance to resolve Nuclear Regulatory Commission (NRC) initiated...

Current Research and Research Needs in Deep Foundations
This report summarizes the current range of research on deep foundations now being performed in the United States. The report is divided into two main sections: (1) Current research or...

Microcomputers for Construction Field Offices
This paper presents an overview of U. S. Army Corps of Engineers experience with using microcomputers for construction management. Construction management applications for contract administration...

Construction Management Software Requirements
With the rapid improvement in capabilities of microcomputer systems, it is possible to develop software for small computers previously only possible on mini or mainframe computers. This...

Construction Estimating Decision Support Systems
A discussion of important considerations in the development of a computerized Decision Support System (DSS) is presented. These considerations include general hardware and software issues...

Computerized Estimating, What's Right for You
Several good computerized estimating programs exist on the marketplace today. Contractors who avail themselves of good systems can generally realize a very respectable return on their...

Trends in Small Computer Utilization
In an effort to determine the extent to which micro and minicomputers have been successfully implemented by construction contractors, the authors compiled a comprehensive questionnaire...

Reinforcing Roof Truss Frames Under Load
Without altering the roof structure of an industrial boiler plant, a long-span steel truss frame was modified in place to support heavier loads. The owners of an industrial boiler plant...

Limited Field Inspection vs. Public Safety
The traditional role of the design engineer in providing field inspection services has been an important component of public safety in the construction industry. The various aspects of...

Onsite Storage Facility for Low Level Radwaste
The Tennessee Valley Authority (TVA) has designed and constructed an onsite storage facility for low level radwaste (LLRW) at its Browns Ferry Nuclear Plant in northern Alabama. The paper...

Automatic Controls for Industrial Water System
An 8-mile pipeline and associated facilities along its route are controlled by a centralized system consisting of a master station and four remotes. Each site employs Westinghouse programmable...

Total Construction Project Delivery Systems
The challenge for the construction industry is for firms to provide total project packages including the design and construction services. The current trend in industry is towards firms...

Planning of CAE and CADD Centers
The factors to be considered prior to the establishment of computer aided engineering or computer aided design and drafting centers are discussed. It is noted that the critical issues...

 

 

 

 