The Modification of Leroy Anderson Dam
An extensive modification program has been implemented to improve the safety and enhance the performance of the Leroy Anderson Dam. The Leroy Anderson Reservoir has a maximum storage of...

Analysis and Rehabilitation of Ambursen Dams
This paper deals with the investigation and analysis of two Ambursen dams located in the upper Midwest. These investigations revealed that the original design contained significant defects,...

Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...

Modeling a Small Side Channel Spillway-Model Testing Need Not Be Expensive or Time-Consuming
Effective hydraulic modeling can often be done without sophisticated laboratory equipment and instrumentation, yet provide adequate design information in less time and at less cost than...

Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...

Spillway Crest Development through Model Testing on Chenderoh Ambursen Dam
The Chenderoh Hydroelectric Project on the Perak River in Malaysia was placed in service in 1930. The hollow Ambursen dam was modified in 1944 by the additions of a concrete cap with flashboards....

Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...

Ghost Dam Safety Evaluation
Ghost Development, owned and operated by TransAlta Utilities, is near the eastern margin of the Rocky Mountain Foothills, approximately 33 km northwest of Calgary, Alberta. The development...

Case Study Safety Evaluation of the Existing Wise Powerhouse Penstock
A 70-year old riveted penstock was analyzed to determine its actual design strength in response to the discovery of significant pressure rises under normal operating conditions due to...

Hydraulic Features of Canyon Lake Hydropower Plant
The original hydraulic features of the Canyon Lake dam were well adapted to the addition of hydropower. Design, construction and anticipated operational details of the added hydropower...

Public Safety through Cooperation
This paper describes the present FERC dam safety compliance program. The program's philosophy and history, organization, and key elements as well as accomplishments are presented...

Overview of EPRI's Hydro Program
The near term objective of the Electric Power Research Institutes (EPRI) Hydro Program is to provide practical and easily used research results and industry guides in the areas of dam...

Fishery Assessments at Hydroelectric Projects Using Electrofishing, Nets, and Hydroacoustics
Assessments of fish population and entrainment were made at a hydroelectric generating station and spill dam on the Ohio River. By combining complementary sampling techniques, full assessments...

Geology Related Construction Problems at the Urugua-i Hydroelectric Project
The Urugua-i Hydroelectric Project in north-eastern Argentina consists of an 80 m high roller-compacted concrete dam, 4.4 km long lateral dike, 800 m long power tunnel, and a 120 MW powerhouse....

Clay Joints in the Foundation of Dkhila Dam
The stability analysis performed at the beginning of construction, taking into account the shear test results of the foundation claystone showed insufficient safety factors against sliding....

Newfoundland's First Arch Dam Construction Versus Climate
Paradise River arch dam is located in a narrow box canyon about 50 m deep and less than 10 m wide at streambed. It is a thin arch dam, especially sensitive to temperature loads, thus contraction...

In-Situ Shear Strength Testing
Dam stabilization requirements at the Upper Mechanicville Hydroelectric Project on the Hudson River in New York were significantly modified based on the results of an in-situ direct shear...

Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...

Development of High Specific Speed Pump-Turbines
The operational range of pump-turbines is continually increasing, especially in the direction of high specific speed installation. In this context, high specific speed refers to units...

Murray?Commissioning Maxi Hydro with Mini Flow
The Murray Hydroelectric Project contains two of the largest pit turbines in the world. An existing dam constructed for navigation and flood control on the Arkansas River, Lock and Dam...

 

 

 

 

Return to search