Addressing Legal Issues in Municipal/Private Cooperative Ventures
The authors were directly involved in negotiating the first contract between a public body and a private developer for the rehabilitation and operation of a hydroelectric project in the...

Escondido Decision?Results, Impacts & Applications
The United States Ninth Circuit Court of Appeals decision of May 15, 1984, now requires Federal agencies and potential licensees to be more responsive to public needs and requirements....

Rim-Drive Turbine for Low Head Applications
A turbine design and testing program was undertaken with the objective of developing a standardized turbine/generator arrangement that would be well suited to the 10 to 30 foot head range....

Dolores Pumped-Storage Unit?A Case Study in Planning
The Durango Projects Office of the U. S. Bureau of Reclamation (Reclamation) conducted a pumped-storage investigation from 1981 to 1983 on a site in southwestern Colorado. This paper describes...

Unique Civil Engineering Features of the Balsam Meadow Pumped-Storage Project
The Balsam Meadow Pumped-Storage Project for the Southern California Edison Company is located in the Sierra Nevada Mountains approximately 55 miles northeast of Fresno, California. The...

The Bath County Pumped Storage Project
Virginia Power and the Allegheny Power System will introduce an important new peaking power service in late 1985, when the first unit of the Bath County Pumped Storage Station becomes...

Main Canal Headworks Hydroelectric Project
This project is being installed at the Dry Falls Dam, Coulee City, Washington, adjacent to the Main Canal Headworks which controls the irrigation releases to the Columbia Basin Project....

Innovative Approach to New Water Supply/Power Development
Since the first deliveries made by the State Water Project (SWP) in the early 1960's the State of California has become known worldwide as a pioneer in the development of...

Prospects for Hydroelectric Power Development at Corps of Engineer Dams
There are two basic approaches to developing hydroelectric power facilities at Corps dams. The Corps can develop projects at the request of Congress through the authorization process....

The Pacific Northwest Hydropower Data Base Study
The Hydropower Data Base is presently a functional tool for evaluating hydropower in the Northwest. It is a complete system which has been implemented using a variety of crosschecks and...

Phased Pumped Storage Planning and Site Evaluation
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process...

The Contribution of Local Area Management Teams Under Severe Environmental Conditions
This paper outlines a Westinghouse managed turnkey hydro electric project located in remote southwestern Wyoming near Kemmerer. The dam provides watershed control for the Hams Fork River,...

Construction of Yellowtail Dam & Power Plant 63-65
The Yellowtail Unit of the Missouri River Basin project is located on the Bighorn River in south central Montana. The key feature of the unit is Yellowtail Dam which rises 525 ft. between...

The Sand Bar Hydroelectric Project: A Case History
The Sand Bar project's major features include a reinforced concrete intake structure; 3. 5 miles of twelve foot diameter hard rock tunnel; a reinforced concrete powerhouse...

The Sultan River Hydroelectric Project
It took almost 70 years and required over 100 separate local, state and federal permits, but in June 1984, development of the Sultan River was finally completed for the multi-purpose use...

Micro PAT-Synchronous Generator Unit for Isolated Power Supply at Sultan Project Dam
The paper describes a unique application of a micro-PAT Unit installation utilizing downstream release flows for providing an isolated power supply at the Jackson (Sultan) dam in Washington...

Retrofitting Outlet Works of Existing Dams for Hydropower
This paper deals with three small hydroelectric plants installed at existing dams in California with moderately high heads (about 200 feet). In each case there was an overriding need to...

Power Development at Buffalo Bill Dam
Buffalo Bill Dam is on the Shoshone River in northwestern Wyoming near the city of Cody. The dam is a 325-foot-high concrete arch facility with a crest length of 200 feet. The dam was...

Economic factors of Hydro Plants Versus Fossil Plants for Load Frequency Control
The purpose of this study was to determine whether hydro plants with Francis turbines or fossil plants are more economical for load frequency control. Using data from the Tennessee Valley...

Economic Evaluation of Alternative Electric Power Developments
A hydroelectric-dominated power system and a thermal-dominated system represent different ways of meeting total electric demand, but with materially different cash flow patterns. This...

 

 

 

 

Return to search