HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....

Interactive Simulation of Hydropower Systems
This paper describes a new educational technology that has proven extremely effective in introducing both technical and lay persons to the operational principles, management alternatives,...

Generic Power System Stabilizer Design
The object of this paper is to describe the design considerations of a microprocessor based power system stabilizer operating through excitation control as applied to a multi-unit pumped...

Optimal Dispatch of Hydroelectric Systems
This paper presents a reliable and computationally efficient method for solving the optimal hydro dispatch problem. Moreover, this method guarantees a true optimal solution when the units'...

Increasing Hydropower Operating Efficiency
A method is described for determining the most efficient use of hydro units in a multiple unit hydro plant. In a multi-unit plant enough flexibility exists to load a chosen set of units...

Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...

HYPOS?Hourly System Hydropower Scheduling
HYPOS (Hydro Power Scheduling) is a modification of the program HYPO as presented at Waterpower 81. HYPOS is an interactive system which allows schedulers to assign hourly power generation...

Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...

Planning of Hydropower Development in Hydrothermal Systems by Capex
This paper discusses the power generation expansion model CAPEX in which provisions are made that specifically account for the distinct characteristics of hydropower. The model determines...

Modeling a Real-Time Reservoir Operation for Hydropower Resources Analysis
This paper deals with modeling the operation of two reservoirs in tandem in order to determine energy gain at the downstream plant due to the regulation provided by the upstream reservoir....

Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...

Simulation of River Ice Processes on Alaska's Susitna River
A numerical river ice model is applied to an 85-mile reach of Alaska's Susitna River immediately downstream of the proposed Susitna Hydroelectric Project. The model is designed...

Riverbank Stability and Monitoring at Grand Coulee Dam
The capability for hydroelectric power generation at Grand Coulee Dam was substantially increased following construction of the third powerplant in the mid 1970s. Increased river fluctuations...

U.S./PRC Cooperation on the Three Gorge Project
The Three Gorge Project is the keystone project in developing and using the Yangtze River. It is located on the main stem of the Yangtze River, about 40 km upstream from the Gezhouba Project...

Long Term Performance of the Goldstream Creek Bridge
In 1964 the Alaska Department of Transportation and the U. S. Army Cold Regions Research and Engineering Laboratory initiated a cooperative study which in the long-term generated a significant...

Anchorage Taps Eklutna Lake for New Water Supply
The 170 million Eklutna Water Project will furnish water to Anchorage, Alaska by the summer of 1988. The project consists of an 8,500-foot long diversion tunnel, 6 miles of 54 to 60-inch...

An Overview of Cold Region Considerations for the Design of the Eklutna Water Project
The paper presents a brief overview of cold regions considerations that were considered during the design of the various elements of the Eklutna Water Project in Anchorage, Alaska. The...

Water Treatment Facility Design for a Glacial Lake
The Municipality of Anchorage, Alaska has undertaken a major water supply project, the Eklutna Water Project, to satisfy the growing water demands of Anchorage. The source of raw water,...

Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...

Arctic Stream Scour: A Case History
A small arctic stream on the North Slope of Alaska was monitored through one hydrologic cycle. The flow rate of the stream and the progress of its erosion through a breach into an adjacent...

 

 

 

 