Analysis of Earthquake Response at a Site With Uncertain Properties
The problem of earthquake response of a soil deposit with uncertain properties is studied in the paper. Various analysis procedures for handling the dynamic response of an uncertain system...

High Wiring Act
Prendergast describes a project to construct a 345 kV transmission line over 313 mi in southwestern New Mexico, in which, due to environmental considerations and limited access, extensive...

A Doubling Design: Rochester's Expanding Airport
Few projects offer greater design challenges or pose more critical construction complexities than a new air passenger terminal, especially when that new terminal must be built on land...

Monitoring Vibration
Vibration monitoring for construction projects is increasing rapidly. Instrumentation for measuring structural response to blasting began in the mining industry with research by the U.S....

Less Bang for the Buck
Blasting rock is practical on job sites with ample space, but on construction sites in urbans or developed settings, contractors are shying away from blasting for several reasons. Noise...

Exploratory Shaft Facility
This paper is an overview of engineering and concept development for the Exploratory Shaft Facility (ESF) of the Yucca Mountain Project. The paper presents a general description of the...

Role of Underground Testing to Determine Suitability of Yucca Mountain as a Potential Repository Site
A brief description of the Exploratory Shaft based site characterization testing program for the Department of Energy's (DOE) Yucca Mountain Project of the permanent disposal...

Synthesis of Studies for the Potential of Fault Rupture at the Proposed Surface Facilities, Yucca Mountain, Nevada
Published data for the Midway Valley area, the proposed site of the surface facilities of a high-level nuclear waste repository at Yucca Mountain, suggest that recognized regional faults...

One-Dimensional Radionuclide Transport Under Time-Varying Conditions
New analytical and numerical solutions are presented for one-dimensional radionuclide transport under time-varying fluid-flow conditions including radioactive decay. The analytical solution...

Simulation of Radionuclide Retardation at Yucca Mountain Using a Stochastic Mineralogical/Geochemical Model
This paper presents preliminary transport calculations for radionuclide movement at Yucca Mountain using preliminary data for retardation parameter distributions based on mineral distributions....

Development of Transportation Operations Requirements: Operations Planning
Transport conditions at various utility sites vary dramatically in terms of characteristics at and near the site, requirements, administrative procedures, and other factors. Continuation...

Development of Rail Access to the Yucca Mountain Site: Technical and Publc Issues
The Yucca Mountain site, located on the southwestern edge of the Nevada Test Site (NTS), is an undeveloped area under investigation as a potential site for high-level nuclear waste (HLW)...

PAGIS & PACOMA: Performance Evaluations of Deep Geological Disposal. Results and Conclusions
Two coordinated research projects were undertaken by the Commission of the European Communities to study the safety performances of geological radwaste disposal systems in the post-operational...

Performance Assessment at the NRC: Current Issues and Recent Progress
Performance assessment plays a major role in the NRC's licensing program for the disposal of high-level radioactive waste. Planned and recent performance assessment activities...

Diffusion Barrier Transport Properties of Unsaturated Paintbrush Tuff Rubble Backfill
Diffusion coefficients (D) were experimentally determined in unsaturated tuff gravel to evaluated the effectiveness of tuff gravel and rubble as a diffusion barrier to ionic transport...

A Waste Package Strategy for Regulatory Compliance
This paper summarizes the strategy given in the Site Characterization Plan (SCP) for demonstrating complicance with the post closure performance objectives for the waste package and the...

Container Material Selection, Modeling and Testing
Virtually all of the approximately 40,000 high-level nuclear wast containers to be emplaced at Yucca Mountain must remain intact for 1,000 years to satisfy Nuclear Regulatory Commission...

MIIT; International In-Situ Testing of Simulated HLW Forms?Preliminary Analyses of SRL 165/TDS Waste Glass and Metal Systems
The first in-situ tests involving burial of simulated high-level waste (HLW) forms conducted in the United States were started on July 22, 1986. This effort, called the Materials Interface...

Dynamic Use of Geoscience Information to Develop Scientific Understanding for a Nuclear Waste Repository
The development and safety evaluation of a nuclear waste geologic repository require a proper scientific understanding of the site response. Such scientific understanding depends on information...

Infill Sampling Design for Geologic Site Characterization of Potential High-Level Radioactive Waste Repositories
Geologic site characterization is fundamental to the selection and design of a high-level radioactive waste repository. Yet, to date, the simple question 'how many samples...

 

 

 

 