The Effect the Central Utah Project Will Have On Water Conservation in Utah
On October 30, 1992, the U.S. Congress passed the Reclamation Projects Authorization and Adjustments Act of 1992 (Public Law 102-575.) This law included the Central Utah Completion Act...
The Small Reclamation Projects Loan Program A Development Tool For The 90's
The Small Reclamation Projects Act (SRPA), Public Law 84-984, was passed in 1956 to encourage state and local participation in the development of projects under Federal Reclamation Law...
Fort Bend County Surface Water Supply Study
Fort Bend County encompasses approximately 876 square miles in southeast Texas near the Gulf of Mexico. The County's sole source of potable water is groundwater, which supplied 28 million...
Application of the PCRSS Reservoir Simulation Model to the Salt River Project
PCRSS is a general purpose reservoir system model construction kit. It allows the user to specify the system configuration and parameters through the use of a windows based graphic user...
The Case for Southern Nevada's Thirst
Water Resources Planning can be associated with short term or long term projects. Civil Engineers can develop plans for any number of eventualities, be they normal expected events or unwanted...
The Role of Partnering and Public Involvement in the Lackawanna River Corridor Greenway Study
Development of partnerships and active public involvement programs has, in the past, been de-emphasized for the more traditional Corps studies. However, as the Corps continues to progress...
Recreating a Process: The West Georgia Regional Water Supply Plan
This paper describes the planning process used to develop a long-range water supply plan for a five-county area northwest of Atlanta, Georgia. Demand for water in the study area is projected...
Involving the Public to Reach Consensus in Water Resources Projects - An Interdisciplinary Perspective
The San Diego County Water Authority (Authority) is developing the Emergency Storage Project (ESP) to improve the reliability of the county's water supply in the event of an extreme emergency,...
Joint Optimization of Groundwater Remediation and Monitoring
We describe the challenge of devising optimization methods which optimize jointly the remediation and monitoring at a contaminated site. We refer to the dual control method as a promising...
Development of an Intergovernmental Agreement For a Major Multi-Party Recharge Project in Central Arizona
The Salt River Project (SRP), a major power and water utility in the Phoenix area, and several municipalities recently completed the development of an intergovernmental agreement (IGA)...
Reoperation of Existing Reservoirs to Serve Changing Needs: Observations on Institutional Inertia, Conflict, and Efficiency
The 'reoperation' of a reservoir system may in some circumstances provide a non-structural alternative for addressing changing water storage needs resulting from population growth or other...
Aquifer Storage and Recovery at the Centennial Water and Sanitation District
water in a suitable aquifer, the peak time capacity of CWSD could be increased while delaying the water treatment plant (WTP) expansion currently scheduled for 1996. To validate this assumption,...
Missouri River Economic Impacts Model
The Missouri River basin recently (1987-1992) experienced a drought that affected project uses and environmental resources. This drought and the need to address changes that have occurred...
Missouri River Master Manual Review and Update
The Missouri River Master Water Control Manual (Master Manual) presents the basic water control plan and objectives for the integrated operation of the six mainstem reservoirs in conjunction...
Technical Understanding in Successful Environmental Negotiations
Scientists at the National Ecology Research Center conducted a series of case studies of consultations concerning the environmental conditions to be included in Federal Energy Regulatory...
Regional Wastewater Reuse in the Nueces Estuary
The results of this study indicate that the firm yield lost to the release requirements of the Texas Water Commission Interim Release Order can be recovered by diverting treated wastewater...
San Diego County Water Authority's Emergency Storage Project Supplying Water During Natural Disasters
The San Diego County Water Authority (Authority) is developing the Emergency Storage Project (ESP) to improve the dependability of the County's water supplies during a natural disaster...
The Job-Order Contracting Solution
A new method of contracting, Job Order Contracting, combines many contracts into one administered by one project team. They are competitively bid, indefinite delivery, indefinite quantity,...
CAD for Small Hydro Projects
The quest to reduce design costs and improve design quality by raising productivity is familiar to every manager and designer. This article examines how CAD can play a role by examining...
Locking Into Success
In 1961, at Wheeler Lock in Alabama, crews with the Tennessee Valley Authority tried to incorporate an existing lock wall into a new cofferdam. A major portion of the land wall slid about...
Return to search