Technology Transfer for Small Hydro
The wide range of different definitions of what constitutes a small hydroelectric power plants is discussed and the conclusion is drawn that this definition should be based more on the...

Challenges in the Design and Manufacture of Small Replacement Runners
The increasing trend within the hydro industry to achieve additional capacity and/or energy through runner replacement has brought with it new challenges for the turbine manufacturer....

Rehabilitation of the Historic Ocoee 1 Hydro Power Plant
The Ocoee 1 Hydro Plant is located on the Ocoee River 16 miles east of Cleveland, Tennessee. Built by the East Tennessee Power Company, it was placed in commercial operation in 1912. There...

On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....

Redondo Beach Thermal Study
Thermal tests were conducted in a 3D physical model of Redondo Beach King Harbor to simulate power plant cooling water intake and discharge into the harbor. Tests were conducted to determine...

Investigations on 3-D Flow Structures in Combined Systems of Groynes and Harbour Basins
The structure of the flow field in harbour basins shows significant three-dimensional (3-D) effects, e.g. variation of the direction of the horizontal velocity components with depth, existence...

McClure Park: A Multi-Purpose Off-Stream Storage Facility for Tulsa, Oklahoma
The City of Tulsa is in the process of implementing a flood control plan for the 61 square-mile (158 km2) Mingo Creek watershed. The federally-assisted...

Maintenance of Stormwater Management Facilities: Neglects in Practice
The Stormwater Management Facilities (SWMF) have become a required component of urban development projects in many parts of the country. In spite of differences in size, type, and physical...

Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...

Liability Insurance Coverages for Designers of Temporary Structures
A recent survey completed by the American Consulting Engineers Counsel (ACEC) indicates that in 1990 approximately 40 claims occurred per 100 firms. There also is an indication that claims...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Site Layout: Where Should it Go?
Site layout is mostly treated as a task independent of other resource allocation tasks such as those that are traditionally associated with construction planning and scheduling. Yet, the...

Hurricane Hugo One Year Later
Hurricane Hugo, which made landfall on September 21, 1989, was the first serious storm to cross the South Carolina coast in over 30 years. During this period, the coastal areas had grown...

Burying By the Bale
The Gallatin National Landfill, now under construction in central Illinois, incorporates multiple safeguards to isolate refuse from surrounding water and soil with an inward gradient design....

Ductile Frames Are Tough for Earthquakes
Implications of a new structural system in wharf design go far beyond San Francisco Bay, where two such wharves remained intact after the 1989 Loma Prieta quake. The design, introduced...

Future Fill-Up
The car rental agencies at Phoenix Sky Harbor Airport have combined their service/filling facilities in the new terminal's parking garage. This permits customers to pick up...

Landfill Park: From Eyesore to Asset
By reclaiming a 50 acre landfill as a recreational area, Cambridge, Mass. increased its open space by 20%. The park includes three softball and three soccer fields, one multisport field,...

 

 

 

 