Santa Barbara Hydrograph with Green-Ampt Infiltration
Numerous models are available to estimate rainfall-induced runoff from watersheds. The leading criteria in model selection is often reproducibility. Models that are reproducible are often...

The Improved SCS TR-20 Network Watershed Model
SCS Technical Release 20, 'Computer Program for Project Formulation - Hydrology' (TR-20), has been revised. Major revisions include new procedures for hydrograph...

Validation of SWRRB?A Simulator for Water Resources in Rural Basins
The three major components of SWRRB are weather, hydrology, and sedimentation. Processes considered include surface runoff, return flow, percolation, evapotranspiration, transmission losses,...

Modeling Streamflow Response from Minnesota Peatlands
A deterministic, continuous simulation model was developed to predict the effects of peatland development on streamflow. The Peatland Hydrologic Impact Model is largely physically based...

Synthetic Unit Hydrographs for Ozark Watersheds
Few concepts in modern hydrology have been more widely used and abused than unit hydrograph theory. Nevertheless, during the years since its introduction in 1932 as an extension of the...

Simulation of Natural Resource Systems
Desertification, defined as the loss in productive capacity of the land, has spawned research in decision making involving multi-objective situations. In this study, computer simulation...

Assessing Risks of Impaired Hydrologic Function
This paper describes the rationale and use of a 'resource tolerance' to evaluate hydrologic function and presents a method to establish a relative tolerance threshold...

Erosion, Productivity and Rangeland Watershed Planning
The Bureau of Land Management is responsible for the management of over 160 million acres of rangeland in the western United States. The principal uses of these rangelands are the grazing...

Modeling Off-Site Impacts
The off-site impacts of a flood water control program were evaluated by applying the SWRRB (Simulation of Water Resources on Rural Basins) model to a treated basin, primarily agricultural,...

The Role of Multiple Level Hydrologic Analysis in Watershed Management?A Case Study in Trinidad
An accurate estimation of peak flood flows and its correlation with existing and future land use are basic requirements for the scientific management of Watersheds. An accurate estimation...

Streamflow Generation from Subalpine Forests
Much of the hydrologic modelling done in the subalpine forest of the central Rockies is based on the Subalpine Water Balance Model. This paper reports on plot studies on the Fraser Experimental...

Prediction of Soil Water Properties for Hydrologic Modeling
Water flow in soils can be characterized for many boundary and initial conditions by solving governing differential equations. Thus, a physically consistent means of quantifying water...

A Systematic Evaluation of Hillslope Subsurface Flow: The Effects of Slope Angle and Soil Parameter Variation
A two-dimensional finite element variably saturated flow model is used in conjunction with an automatic mesh generating scheme to simulate hillslope subsurface flow. Slopes from 2% to...

Computer Applications in Grouting
The first use of computers during foundation grouting was tried by the Bureau of Reclamation on Ridgeway Dam in Colorado. It was very useful in monitoring real time down hole conditions...

Computer Modeling of Roof Support
The Bureau of Mines is using a full-scale geotechnical model of a 15-foot-wide (4. 6-m) coal mine entry in correlation with computer finite-element analysis at its Spokane Research Center...

Modelling of the Fracture Process Zone in Rock
There are a number of situations in the fracture mechanics of rock in which linear elastic fracture mechanics (LEFM) concepts are inapplicable or insufficient. Two such situations are...

Prediction of Highway Construction Noise Levels
A model for the prediction of noise levels from highway construction operations has been developed under sponsorship of the Federal Highway Administration (FHWA). Noise sources are geometrically...

Checking Off CADD Priorities
Diving head on into new computer aided design and drafting (CADD) hardware and software without considering their effects on firm or university's operation is as bad as ignoring...

Computer Impacts on Water Resources Engineering
Computation capability has increased by a factor of one million over the past 30 years and has contributed greatly toward data management and the application of available technology to...

Computers in a Planning Context: Another Reality
Over the past twenty years water resources planning has seen a great increase in the development of computer methods of analysis. This has transformed the way the hydrology, hydraulics,...

 

 

 

 

Return to search