Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Productivity Applications: 3D Models & Simulation
Background. Although three-dimensional computer models have been used to some degree in practice by a few large engineering and construction firms, there has been little research into...

Wrapping up Environmental Issues in an Embankment
Contamination on a construction site can lead to increased risk of unanticipated construction delays and increased costs. In response, some owners are opting for proactive approaches to...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Integrated Design and Construction Planning by Knowledge-based Systems
The main objective of this paper is to describe applications of knowledge-based systems for the improvement of planning and management efficiency at the early design stage, and to propose...

Conceptual Model for a Site Operations Control System
This study discusses a conceptual model for designing an on-site management control system. Capabilities of this proposed Site Operations Control System (SOCS) include a mechanism for...

Construction Inspection in South Carolina
The paper will discuss the experience of the South Carolina Department of Transportation in the use of consulting engineering firms on bridge construction projects. A review of the current...

Site Layout: Where Should it Go?
Site layout is mostly treated as a task independent of other resource allocation tasks such as those that are traditionally associated with construction planning and scheduling. Yet, the...

Kinematics and Trajectory Planning for Robotic Excavation
One of the high volume and repetitive construction operations at the construction site is the excavation of soil. Automation of the excavation work requires a robotic system that is able...

Construction Documents Revised
The Engineers Joint Contract Document Committee has produced revised documents, which are available from ASCE. The committee includes ASCE, the National Society of Professional Engineers,...

Where Does Rock Begin Beneath Philadelphia?
Philadelphia provides an excellent example of the engineering problems associated with the interpretation of saprolite/weathered rock/sound rock profiles. The bedrock beneath the city...

Foundation Studies in a Fault Zone and a Steep Valley Slope
This paper presents two case histories which illustrate unique problems in defining the character of rock for support of structures. The first case study concerns a conventional building...

Soil-Rock Transition Zone: Uncertainties for Design and Construction
This paper addresses the problem of establishing definitions of the soil-rock boundary with regard to different engineering applications in the Piedmont geologic provinces. Three engineering...

Rock in the Limestone Regions of the Southeastern United States
Problems often arise in the shaft drilling industry in the Southeast. The karst areas in this region have certain situations found in few other places. Erratic boulders and limestone pinnacles...

Determination and Presentation of Subsurface Conditions for Design and Construction
A major problem in the design and construction of many engineering projects is the lack of adequate geotechnical information both for design and for determining conditions to be encountered...

Innovative Breakwater Designs on the Great Lakes
Extensive investigations have recently been undertaken to support the development of rubblemound breakwater designs for new marinas at Kenosha and Sheboygan, WI, both located on the west...

Planning and Designing the Land and Water Human Environments in Marinas
Historically, the planning and design of marinas placed the greatest emphasis on solutions which served the inanimate objects comprising marinas-boats, docks, buildings, automobiles and...

Historic Dam Rehab: Handle with Care
A growing number of dams across the U.S. are aging and in need of rehabilitation, but can they be brought up to current codes without compromising their historic integrity? Improved methods...

Analyzing Risk
Engineers designing major projects must often grapple with large areas of uncertainty�from estimating the seismic hazard to a nuclear powerplant to the potential effects of decades of...

 

 

 

 

Return to search